Permit GraphShortlistSan Francisco building permits since 2000

A W Construction

Contractor license
930013
State license record
Based in
Menlo Park
On San Francisco permits
Feb 2019 to Aug 2026
Last 24 months
5 permits filed

7 permits since 2000: 5 completed, 2 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllDeck 2Stairs 1Bathroom remodel 3

3 bathroom remodel permits: 1 completed, 2 in progress. Typically 12 days from filing to permit and 370 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 20, 2026In progress
issued Sep 2026
671 Clay Stinterior t.i. within (e) commercial tenant space. relocation of door in employee bathroom. limited modifications to non-structural partitions. new power receptacles. installation of two sinks utilizing existing plumbing as much as possible. new floor electrical and plumbing to serve head spa unit.
Details
Permit
202608206955
Status
issued
Filed
Aug 20, 2026
Permit issued
Sep 9, 2026
Declared cost
$80,000
Address
671 Clay St

interior t.i. within (e) commercial tenant space. relocation of door in employee bathroom. limited modifications to non-structural partitions. new power receptacles. installation of two sinks utilizing existing plumbing as much as possible. new floor electrical and plumbing to serve head spa unit.

Open the permit page

$80,000
Aug 13, 2026In progress
issued Aug 2026
1443 25th Avconvert sun room into bathroom. fill in 2 window, replace 2 windows with smaller. add electrical and plumbing.
Details
Permit
202608136571
Status
issued
Filed
Aug 13, 2026
Permit issued
Aug 25, 2026
Declared cost
$52,000
Address
1443 25th Av

convert sun room into bathroom. fill in 2 window, replace 2 windows with smaller. add electrical and plumbing.

Open the permit page

$52,000
Feb 5, 2019Completed
final sign-off Feb 2020
120 Landers Stste f: remodel bathroom in master bedroom everything stays in same location. no structural change. replace 2 existing skylights like for like
Details
Permit
201902052112
Status
complete
Filed
Feb 5, 2019
Permit issued
Feb 5, 2019
Final sign-off
Feb 10, 2020
Declared cost
$10,000
Address
120 Landers St

ste f: remodel bathroom in master bedroom everything stays in same location. no structural change. replace 2 existing skylights like for like

Open the permit page

$10,000