Back to bathroom remodel contractors
A W Construction
- Based in
- Menlo Park
- On San Francisco permits
- Feb 2019 to Aug 2026
- Last 24 months
- 5 permits filed
7 permits since 2000: 5 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 1 completed, 2 in progress. Typically 12 days from filing to permit and 370 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Sep 2026 | 671 Clay St | interior t.i. within (e) commercial tenant space. relocation of door in employee bathroom. limited modifications to non-structural partitions. new power receptacles. installation of two sinks utilizing existing plumbing as much as possible. new floor electrical and plumbing to serve head spa unit.Details
interior t.i. within (e) commercial tenant space. relocation of door in employee bathroom. limited modifications to non-structural partitions. new power receptacles. installation of two sinks utilizing existing plumbing as much as possible. new floor electrical and plumbing to serve head spa unit. | $80,000 |
| Aug 13, 2026 | In progress issued Aug 2026 | 1443 25th Av | convert sun room into bathroom. fill in 2 window, replace 2 windows with smaller. add electrical and plumbing.Details
convert sun room into bathroom. fill in 2 window, replace 2 windows with smaller. add electrical and plumbing. | $52,000 |
| Feb 5, 2019 | Completed final sign-off Feb 2020 | 120 Landers St | ste f: remodel bathroom in master bedroom everything stays in same location. no structural change. replace 2 existing skylights like for likeDetails
ste f: remodel bathroom in master bedroom everything stays in same location. no structural change. replace 2 existing skylights like for like | $10,000 |