Back to bathroom remodel contractors
A To Z Building
- Based in
- Hayward
- On San Francisco permits
- Dec 2014 to Mar 2026
- Last 24 months
- 1 permit filed
13 permits since 2000: 10 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 25 days from filing to permit and 769 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 28, 2023 | Completed final sign-off Mar 2026 | 1671 45th Av | 1)add new bedrooms at 1st floor. 2)eliminate bedroom on 2nd and 3rd floor to extpand extg kitchen. 3)reconfigure bathrooms on 2nd and third floor.Details
1)add new bedrooms at 1st floor. 2)eliminate bedroom on 2nd and 3rd floor to extpand extg kitchen. 3)reconfigure bathrooms on 2nd and third floor. | $20,000 |
| Sep 25, 2023 | Completed final sign-off Mar 2026 | 1671 45th Av | remodel (4) bathrooms and (2) kitchen in kind. new electrical and plumbing. front facade remodel. new windowsDetails
remodel (4) bathrooms and (2) kitchen in kind. new electrical and plumbing. front facade remodel. new windows | $140,000 |
| Jun 5, 2023 | Never finaled issued Jun 2023, no final | 1409 Polk St | basement: provide partition wall between 1401 & 1409 polk st. paint basement walls & celing. as part of the 20% diabled access rule remodel one of the bathrooms.Details
basement: provide partition wall between 1401 & 1409 polk st. paint basement walls & celing. as part of the 20% diabled access rule remodel one of the bathrooms. | $25,000 |
| Nov 5, 2020 | Completed final sign-off Apr 2021 | 549 28th St | renovation of master bathroom at level 2. renovation of kitchen at level 3. electrical & plumbing work as required. no expension of building envelope. add wetbar at 3/f dining area.Details
renovation of master bathroom at level 2. renovation of kitchen at level 3. electrical & plumbing work as required. no expension of building envelope. add wetbar at 3/f dining area. | $52,000 |