Back to bathroom remodel contractors
A Plus Builder
- Based in
- Daly City
- On San Francisco permits
- Jun 2009 to Jul 2018
- Last 24 months
- 0 permits filed
41 permits since 2000: 29 completed, 6 never finaled, 6 expired or cancelled.
Of the 6 never-finaled permits, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 10 completed, 2 never finaled, 2 expired or cancelled. Typically 7 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2016 | Expired or cancelled expired Jan 2025 | 460 12th Av | unit legalization ordinance# 43-14. legalize as built unit #3 on 1st floor 2 bedrooms, kitchen, living room, bathroom.Details
unit legalization ordinance# 43-14. legalize as built unit #3 on 1st floor 2 bedrooms, kitchen, living room, bathroom. | $20,000 |
| Nov 10, 2015 | Completed final sign-off Jan 2016 | 1000 Powell St | unit #25: remodel the whole unit including the kitchen and full bathroom.Details
unit #25: remodel the whole unit including the kitchen and full bathroom. | $20,000 |
| Sep 8, 2015 | Completed final sign-off Dec 2015 | 347 Frederick St | revision to pa 201407141172 - to remove laundry hook up to bathroom on 1/floor.Details
revision to pa 201407141172 - to remove laundry hook up to bathroom on 1/floor. | |
| Sep 8, 2015 | Never finaled issued Sep 2015, no final | 1224 Hyde St | #5 - replace wall cabinet in the kitchen & replace ceiling fan in the bathroom.Details
#5 - replace wall cabinet in the kitchen & replace ceiling fan in the bathroom. | $2,000 |
| Aug 14, 2015 | Completed final sign-off Nov 2015 | 1000 Powell St | unit #s: 63 and 65: remodel two full bathrooms, 2 kitchens, and change the subpanel. no alteration of wall, window and door.Details
unit #s: 63 and 65: remodel two full bathrooms, 2 kitchens, and change the subpanel. no alteration of wall, window and door. | $40,000 |
| Aug 10, 2015 | Completed final sign-off Jan 2016 | 345 Frederick St | revision to app#201506249745. add shearwall at 2nd floor unit 345 frederick street going to foundation. update as built bathroom layout on 2nd floor.Details
revision to app#201506249745. add shearwall at 2nd floor unit 345 frederick street going to foundation. update as built bathroom layout on 2nd floor. | $9,000 |
| Jun 24, 2015 | Completed final sign-off Dec 2015 | 345 Frederick St | unit #345, 2nd flr: kitchen and bath remodel, add (n) partition wall.Details
unit #345, 2nd flr: kitchen and bath remodel, add (n) partition wall. | $30,000 |
| Jul 3, 2014 | Completed final sign-off Mar 2017 | 1632 Noriega St | tenant improvement, change existing bath to comply with ada requirement, adding shower room and steam room. no change of facade at front.Details
tenant improvement, change existing bath to comply with ada requirement, adding shower room and steam room. no change of facade at front. | $30,000 |
| Feb 11, 2014 | Completed final sign-off Nov 2014 | 318 Noriega St | add laundry room & closet, remodel (e) bathroom & (e) kitchen on 1st floor unit.Details
add laundry room & closet, remodel (e) bathroom & (e) kitchen on 1st floor unit. | $5,000 |
| Dec 23, 2013 | Never finaled issued Dec 2013, no final | 1411 21st Av | remodel whole bath with tiles, sheetrocks, plumbing & electrical. no changes on walls.Details
remodel whole bath with tiles, sheetrocks, plumbing & electrical. no changes on walls. | $8,000 |
| Dec 4, 2013 | Completed final sign-off Oct 2014 | 201 Hale St | reconfigure e bathroom, kitchen and bedrooms at 2nd fl and construct new stair from 2nd fl to 1st fl. remodel e bathroom, add 2 new bedrooms, 1 family room at 1st fl. relocate e garage door and replace e windowsDetails
reconfigure e bathroom, kitchen and bedrooms at 2nd fl and construct new stair from 2nd fl to 1st fl. remodel e bathroom, add 2 new bedrooms, 1 family room at 1st fl. relocate e garage door and replace e windows | $65,000 |
| Jul 23, 2013 | Expired or cancelled expired Dec 2022 | 316 Noriega St | add utility room, existing kitchen and e bath remodel on 2nd floor per plan, remodel e master bath on 3rd flDetails
add utility room, existing kitchen and e bath remodel on 2nd floor per plan, remodel e master bath on 3rd fl | $20,000 |
| Feb 19, 2013 | Completed final sign-off Aug 2013 | 3597 Mission St | add 2 bedrooms, 1 entertainment room and 1 bath on 1st floor. relocate existing kitchen and bedroom, 1 bath on 2nd fl, convert existing storage room to den on 3rd flDetails
add 2 bedrooms, 1 entertainment room and 1 bath on 1st floor. relocate existing kitchen and bedroom, 1 bath on 2nd fl, convert existing storage room to den on 3rd fl | $56,000 |
| Jun 21, 2012 | Completed final sign-off Oct 2012 | 33 Downey St | kitchen and bathroom remodel on 1st, 2nd, and 3rd floor per plan. new supplemental electric heat.Details
kitchen and bathroom remodel on 1st, 2nd, and 3rd floor per plan. new supplemental electric heat. | $48,000 |