502 permits since 2000: 352 completed, 6 in progress, 74 never finaled, 70 expired or cancelled.
Of the 74 never-finaled permits, 1 is 3 to 5 years old, 18 are 5 to 10 years old, 55 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
26 deck permits: 20 completed, 1 in progress, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 70 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2024 | In progress issued Jul 2024 | 540 29th St | work performed per hr wellington report #987127 items 1d, 1e, 3a, 4a, 4b, 9a, 11d, 4d and 4e. remove stucco at front facade and repair dryrot. restucco disturbed areas. repair substructure framing. repair rear deck less than 50% in kind repair.Details
work performed per hr wellington report #987127 items 1d, 1e, 3a, 4a, 4b, 9a, 11d, 4d and 4e. remove stucco at front facade and repair dryrot. restucco disturbed areas. repair substructure framing. repair rear deck less than 50% in kind repair. | $32,500 |
| Feb 3, 2023 | Completed final sign-off Mar 2024 | 145 Northwood Dr | 1) remodeling of a single family dwelling. 2) relocate interior stair. 3) remodeling (e) kitchen. 4) replace (e) rear window/door at 2/f deck. 5) provide (n) rear deck over (e) conc. slab and new rear folding door at 1/f. 6) remove (e) window at 2/f closet.Details
1) remodeling of a single family dwelling. 2) relocate interior stair. 3) remodeling (e) kitchen. 4) replace (e) rear window/door at 2/f deck. 5) provide (n) rear deck over (e) conc. slab and new rear folding door at 1/f. 6) remove (e) window at 2/f closet. | $60,000 |
| May 9, 2017 | Completed final sign-off May 2017 | 343 Austin St | repair rear exterior deck and stair assembly. less than 50%, in kind replacement. replace 100 sq ft of siding in kind at rear of building.Details
repair rear exterior deck and stair assembly. less than 50%, in kind replacement. replace 100 sq ft of siding in kind at rear of building. | $6,000 |
| Feb 23, 2016 | Completed final sign-off Sep 2016 | 4753 Mission St | to comply with nov #201153104 item # 2 only- repair & replace (e) rear stair & deck assembly in-kind (less than 50%) of a mixed used building. n/a ordinance #155-13Details
to comply with nov #201153104 item # 2 only- repair & replace (e) rear stair & deck assembly in-kind (less than 50%) of a mixed used building. n/a ordinance #155-13 | $2,000 |
| Sep 23, 2015 | Completed final sign-off Feb 2016 | 650 15th Av | 1) new deck at rear yard for s.f.d. 2) interior remodeling (kitchen & bathroom as shown; 3)mechanical, electrical & plmg under seperate permits.Details
1) new deck at rear yard for s.f.d. 2) interior remodeling (kitchen & bathroom as shown; 3)mechanical, electrical & plmg under seperate permits. | $45,000 |
| Nov 20, 2012 | Completed final sign-off Feb 2013 | 230 Portola Dr | remove stucco from area below leaking rear deck and repair dryrot damage in kind. replace deck membrane and stucco to mtach existing. paint all disturbed stucco surfaces.Details
remove stucco from area below leaking rear deck and repair dryrot damage in kind. replace deck membrane and stucco to mtach existing. paint all disturbed stucco surfaces. | $10,000 |
| Jun 8, 2012 | Completed final sign-off Jul 2012 | 1130 Haight St | repair dryrotted 2x12 framing joist & support framing joists and support framing for entrance landing. repair in kind, less than 50%. all wood work and deck, surfaces will be replaced in kind. paint to match existing color scheme.Details
repair dryrotted 2x12 framing joist & support framing joists and support framing for entrance landing. repair in kind, less than 50%. all wood work and deck, surfaces will be replaced in kind. paint to match existing color scheme. | $12,000 |
| Nov 18, 2011 | Completed final sign-off Dec 2011 | 265 Cumberland St | repair rear deck in kind. less than 50% replaced memebers.Details
repair rear deck in kind. less than 50% replaced memebers. | $4,500 |
| Apr 14, 2011 | Completed final sign-off May 2011 | 2909 23rd St | dryrot repair less than 50% of rear deck system. install new clips and straps, replace dryrot damaged guard railing with new redwood material. no structural. not visible from streetDetails
dryrot repair less than 50% of rear deck system. install new clips and straps, replace dryrot damaged guard railing with new redwood material. no structural. not visible from street | $8,000 |
| Nov 24, 2010 | Completed final sign-off Apr 2011 | 11 High St | revision to pa# 2010.09.08.0391 to add additional steel plates to reinforce (e) joists at seven (7) decks.Details
revision to pa# 2010.09.08.0391 to add additional steel plates to reinforce (e) joists at seven (7) decks. | $10,000 |
| Nov 5, 2010 | Completed final sign-off Dec 2010 | 54 States St | repair as per h.r. wellington inc. report #881761, item# 9a(see attached termite report. exterior decks @ state st. less than 50%.Details
repair as per h.r. wellington inc. report #881761, item# 9a(see attached termite report. exterior decks @ state st. less than 50%. | $9,500 |
| Sep 8, 2010 | Completed final sign-off Apr 2011 | 11 High St | repair common area decks per attached plans, repair in kind (7 total).Details
repair common area decks per attached plans, repair in kind (7 total). | $110,000 |
| Jun 10, 2009 | Completed final sign-off Oct 2009 | 559 Douglass St | new exterior steel stair with new deck to replace existing deck at rear of propertyDetails
new exterior steel stair with new deck to replace existing deck at rear of property | $60,000 |
| Jun 30, 2008 | Expired or cancelled expired Jun 2013 | 201 Virginia Av | deck repair. remove dry rotted 4x4 post and replace with new 6x6 p.t. post and install new footings with galvanized cb brackets.Details
deck repair. remove dry rotted 4x4 post and replace with new 6x6 p.t. post and install new footings with galvanized cb brackets. | $6,000 |
| Nov 26, 2007 | Never finaled issued Nov 2007, no final | 2816 35th Av | remove decking fascia boards & decorative skirt board at front balcony. remove stucco at antilevered balcony joist & below front window. install a combination of metal flushing & bituthene below window above joists. restore stucco surfaces to a reasonable match of (e). replace decking boards withDetails
remove decking fascia boards & decorative skirt board at front balcony. remove stucco at antilevered balcony joist & below front window. install a combination of metal flushing & bituthene below window above joists. restore stucco surfaces to a reasonable match of (e). replace decking boards with | $1,500 |
| Jul 23, 2007 | Completed final sign-off Aug 2007 | 1367 03rd Av | dry rot repair at rear deck. less than 50% lower unit, replace in kind.Details
dry rot repair at rear deck. less than 50% lower unit, replace in kind. | $8,000 |
| May 15, 2007 | Completed final sign-off Dec 2007 | 446 Castenada Av | remove existing deck, remove existing stone retaining wall & install new retaining wall, install low voltage lighting system.Details
remove existing deck, remove existing stone retaining wall & install new retaining wall, install low voltage lighting system. | $10,000 |
| Aug 25, 2006 | Completed final sign-off Oct 2007 | 4943 17th St | install new decking at rear of building for both floors (1st & 2nd floor); to comply with his nov #200668492 dated april 29, 2006.Details
install new decking at rear of building for both floors (1st & 2nd floor); to comply with his nov #200668492 dated april 29, 2006. | $10,000 |
| Feb 8, 2005 | Completed final sign-off Jun 2005 | 1453 Grant Av | remove/replace(e)sidewalk w/(n)metal deck w/conc.fill.add 4 new steel columns & 1 steel beam.Details
remove/replace(e)sidewalk w/(n)metal deck w/conc.fill.add 4 new steel columns & 1 steel beam. | $20,000 |
| May 11, 2004 | Completed final sign-off Jun 2004 | 235 Dorland St | repair in kind about 40% (e)ground deck,remove rottted wood & replace w/pressure treated lumberDetails
repair in kind about 40% (e)ground deck,remove rottted wood & replace w/pressure treated lumber | $3,000 |
| Jan 15, 2003 | Expired or cancelled expired Aug 2007 | 490 Marietta Dr | repair of fungus damage to front deck assembly.repair in kind. less than 50%.Details
repair of fungus damage to front deck assembly.repair in kind. less than 50%. | $2,500 |
| Jan 14, 2003 | Completed final sign-off Feb 2003 | 415 Castenada Av | replace 2 doors at kitchen deck, repair dryrot & termite damage at rear deck, repair in kindDetails
replace 2 doors at kitchen deck, repair dryrot & termite damage at rear deck, repair in kind | $2,500 |
| Nov 1, 2002 | Never finaled issued Nov 2002, no final | 1134 Irving St | repair dry rot at rear deck, change cost of jobe per inspector for appl#200209196968Details
repair dry rot at rear deck, change cost of jobe per inspector for appl#200209196968 | $60,000 |
| Jun 12, 2002 | Expired or cancelled expired Oct 2002 | 541 Duncan St | repair rear deck, damaged posts & floor joists at rear deck, repair in kind, less than 50%Details
repair rear deck, damaged posts & floor joists at rear deck, repair in kind, less than 50% | $3,700 |
| Apr 6, 2001 | Completed final sign-off May 2001 | 121 Brompton Av | removed damaged material on main entry decking & replace with new pressure treated framing. replaceDetails
removed damaged material on main entry decking & replace with new pressure treated framing. replace | $1,000 |
| Aug 2, 2000 | Completed final sign-off Sep 2000 | 577 Frederick St | repair rear base, concrete wall, lower deck, ground level stairs, siding door (rear) repair in kindDetails
repair rear base, concrete wall, lower deck, ground level stairs, siding door (rear) repair in kind | $6,000 |