A M G Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Jun 2009
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2009 | Completed final sign-off Aug 2009 | 105 Banks St | bathroom remodel (no relocation of any walls) replacement of plumbing fixtures. retile floors and walls. plumbing & electrical under separate permit.Details
bathroom remodel (no relocation of any walls) replacement of plumbing fixtures. retile floors and walls. plumbing & electrical under separate permit. | $15,000 |
| Feb 13, 2009 | Completed final sign-off May 2009 | 489 Harrison St | unit 405 - installation of new casework, carpet, wood flooring. move location of approx. (3) sprinklers heads. various electrical outlets, paint, install new wall coverings.Details
unit 405 - installation of new casework, carpet, wood flooring. move location of approx. (3) sprinklers heads. various electrical outlets, paint, install new wall coverings. | $155,000 |
| May 1, 2008 | Completed final sign-off Nov 2008 | 631 Ofarrell St | interior condominum remodel, demo non load bearing elements. new cabinets, fixtures, finishes. re-configure electrical & plumbingDetails
interior condominum remodel, demo non load bearing elements. new cabinets, fixtures, finishes. re-configure electrical & plumbing | $60,000 |
| Jun 4, 2007 | Completed final sign-off May 2008 | 999 Green St | change out e existing closets for buildt in closets, chage lighting fixtures . install new tile on flor . inlstall new carpets, paint. new lighting in bathroom & kitchen.Details
change out e existing closets for buildt in closets, chage lighting fixtures . install new tile on flor . inlstall new carpets, paint. new lighting in bathroom & kitchen. | $55,000 |
| Aug 21, 2006 | Completed final sign-off Sep 2006 | 3585 18th St | repair rear stairs. (2) stringers & few steps. <50% . repair if >50% replaced, bldg inspector may require plans & city planning approval. all work in kind. note: bldg has two rear stairs.Details
repair rear stairs. (2) stringers & few steps. <50% . repair if >50% replaced, bldg inspector may require plans & city planning approval. all work in kind. note: bldg has two rear stairs. | $3,500 |
| Oct 4, 2005 | Completed final sign-off Feb 2006 | 3585 18th St | repair back stairs and porches, less than 50% of structureDetails
repair back stairs and porches, less than 50% of structure | $5,000 |