Back to bathroom remodel contractors
A L Martin Construction
- Based in
- Inverness
- On San Francisco permits
- Jan 2005 to Sep 2026
- Last 24 months
- 8 permits filed
165 permits since 2000: 133 completed, 5 in progress, 16 never finaled, 11 expired or cancelled.
Of the 16 never-finaled permits, 4 are 5 to 10 years old, 12 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
46 bathroom remodel permits: 36 completed, 1 in progress, 3 never finaled, 6 expired or cancelled. Typically 0 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2024 | Completed final sign-off Jun 2025 | 1455 Eucalyptus Dr | (n) deck from kitchen to rear yard. interior remodel: remodel (e) ktchen & bathroom w/ new fixtures & finishes. replace (e) windows, none face street. new bathroom & replace internal stair. convert space behind garageDetails
(n) deck from kitchen to rear yard. interior remodel: remodel (e) ktchen & bathroom w/ new fixtures & finishes. replace (e) windows, none face street. new bathroom & replace internal stair. convert space behind garage | $200,000 |
| Jul 21, 2023 | In progress issued Apr 2024 | 377 Santa Ana Av | renovation of detached, single-family residence to include: - raising the second floor level to accommodate a new roof deck; - new primary closet, work area and laundry addition at second floor; - new raised patio at first floor; - new partition walls for new bathroom and kitchen.Details
renovation of detached, single-family residence to include: - raising the second floor level to accommodate a new roof deck; - new primary closet, work area and laundry addition at second floor; - new raised patio at first floor; - new partition walls for new bathroom and kitchen. | $574,719 |
| Aug 12, 2022 | Expired or cancelled cancelled Jan 2026 | 82 Cameo Wy | renovation of existing kid's bathroom. replacement of exterior wood siding in kind. provide new front gate, fence and courtyard paving. replacement of front facing windows in existing opening. new paint at existing flashing, vents, and flues. new front facing sconce.Details
renovation of existing kid's bathroom. replacement of exterior wood siding in kind. provide new front gate, fence and courtyard paving. replacement of front facing windows in existing opening. new paint at existing flashing, vents, and flues. new front facing sconce. | $53,868 |
| Jun 10, 2022 | Completed final sign-off Dec 2022 | 995 Dolores St | remodel kitchen, remove non-structural partition,new appliances and fixtures and finishes replace 3 windows in-kind. remodel 2 (e) bathrooms, new fixtures, finishes and 2 windows in-kind not visible from the street.Details
remodel kitchen, remove non-structural partition,new appliances and fixtures and finishes replace 3 windows in-kind. remodel 2 (e) bathrooms, new fixtures, finishes and 2 windows in-kind not visible from the street. | $125,000 |
| Jun 8, 2022 | Completed final sign-off Dec 2022 | 1340 Mcallister St | selected demo (non-structural); replace selected windows; remodel kitchen, sunroom, full bathroom & closet windows not visible from public view work on one unit.Details
selected demo (non-structural); replace selected windows; remodel kitchen, sunroom, full bathroom & closet windows not visible from public view work on one unit. | $47,600 |
| May 6, 2022 | Expired or cancelled expired Apr 2025 | 3755 20th St | revision to 202201186126. interior renovarion: kitchen remodel, new main bedroom & bath configurarion. new 3rd fl bath and laundry. no changes to exterior. upgrade lihgting & electrical w/ new radiant fl.Details
revision to 202201186126. interior renovarion: kitchen remodel, new main bedroom & bath configurarion. new 3rd fl bath and laundry. no changes to exterior. upgrade lihgting & electrical w/ new radiant fl. | |
| Jan 18, 2022 | Expired or cancelled expired Apr 2025 | 3755 20th St | interior renovation of a single family home. alteration include kitchen remodel, new main bedroom & bath configuration. new 3rd floor bathroom & laundry areas. no change to exterior. upgrade lighting & electrical with new radiant floor.Details
interior renovation of a single family home. alteration include kitchen remodel, new main bedroom & bath configuration. new 3rd floor bathroom & laundry areas. no change to exterior. upgrade lighting & electrical with new radiant floor. | $300,000 |
| Dec 8, 2021 | Completed final sign-off May 2022 | 108 Divisadero St | remodel (e) bathroom including demolition, new construction with new plumbing fixtures, electrical lighting and finishes.Details
remodel (e) bathroom including demolition, new construction with new plumbing fixtures, electrical lighting and finishes. | $18,000 |
| May 17, 2021 | Expired or cancelled cancelled Jul 2022 | 2767 Clay St | 2 in kind bath renovation, 1 1/2 bath near garage. full bath 2nd fl next to bedroom closet. one in kind window replacement. replace lights and add outlets in basementDetails
2 in kind bath renovation, 1 1/2 bath near garage. full bath 2nd fl next to bedroom closet. one in kind window replacement. replace lights and add outlets in basement | $20,000 |
| Sep 30, 2020 | Completed final sign-off May 2022 | 55 Carl St | interior work to include remodeling the kitchen, bedrooms, bathroom. add new bathroom on g/f. structural work to inlcude foundation work as well as adding posts & beam for seismic bracing.Details
interior work to include remodeling the kitchen, bedrooms, bathroom. add new bathroom on g/f. structural work to inlcude foundation work as well as adding posts & beam for seismic bracing. | $50,000 |
| May 20, 2019 | Completed final sign-off Sep 2019 | 36 Perego Tr | bathroom remodel. replace tub, sink & toilet. fixts to remain in same locations. no structural work. approx 40 sq ft.Details
bathroom remodel. replace tub, sink & toilet. fixts to remain in same locations. no structural work. approx 40 sq ft. | $15,000 |
| Mar 11, 2019 | Completed final sign-off May 2019 | 55 28th St | remodel bathroom: replace toilet,m sink, and bathtub, tile . no structural work. no change to layouts. approx 5x7.Details
remodel bathroom: replace toilet,m sink, and bathtub, tile . no structural work. no change to layouts. approx 5x7. | $10,000 |
| Jan 29, 2019 | Completed final sign-off Feb 2020 | 14 Havens St | remodel of interior partitions and doors, relocation of bathrooms, addition of livable area in non-habitable spaceDetails
remodel of interior partitions and doors, relocation of bathrooms, addition of livable area in non-habitable space | $72,000 |
| Oct 19, 2018 | Completed final sign-off Sep 2019 | 26 Hidalgo Tr | new double hipped skylight in upper floor bathroom. structural workDetails
new double hipped skylight in upper floor bathroom. structural work | $5,000 |
| May 9, 2018 | Completed final sign-off Sep 2019 | 26 Hidalgo Tr | convert unfinished basement on garage lvl to playroom. add new bathroom and laundry to gar. lev;. fill in lightwell and renovate kitchen & bathrm on main lvl. new sliding doors to new rear deck off main lvl. fill in lightwell & renovate bathrm on upper lvl. r&r old furnace. new struct workDetails
convert unfinished basement on garage lvl to playroom. add new bathroom and laundry to gar. lev;. fill in lightwell and renovate kitchen & bathrm on main lvl. new sliding doors to new rear deck off main lvl. fill in lightwell & renovate bathrm on upper lvl. r&r old furnace. new struct work | $250,000 |
| Jan 31, 2017 | Completed final sign-off Oct 2018 | 248 San Carlos St | remodel (e) half bath into full bath @ 2nd floor. replace window, not visible from street.Details
remodel (e) half bath into full bath @ 2nd floor. replace window, not visible from street. | $35,000 |
| Dec 23, 2016 | Completed final sign-off Jul 2018 | 465 Bartlett St | interior remodel and addition. replace in kind 3-story rear pop out. 1st floor addition of 2 bedrooms, home office, 2 baths and laundry. n hvac, elect. & plmg. replace 11 windows. 2nd floor: remodel kitchen and 1 bath. 3rd floor: remodel 1 bedroom and add rough in plumbing for bath.Details
interior remodel and addition. replace in kind 3-story rear pop out. 1st floor addition of 2 bedrooms, home office, 2 baths and laundry. n hvac, elect. & plmg. replace 11 windows. 2nd floor: remodel kitchen and 1 bath. 3rd floor: remodel 1 bedroom and add rough in plumbing for bath. | $475,000 |
| Mar 29, 2016 | Completed final sign-off Apr 2017 | 1271 Stanyan St | residential remodel, main level, relocate powder room, expand kitchen area and remodel upper level. remodel/reconfigure master bath and closet. remodel bath. remodel garden shed at rear, 92 sfDetails
residential remodel, main level, relocate powder room, expand kitchen area and remodel upper level. remodel/reconfigure master bath and closet. remodel bath. remodel garden shed at rear, 92 sf | $200,000 |
| Mar 4, 2016 | Completed final sign-off Feb 2017 | 139 Marietta Dr | upper level - remodel kitchen, bath, replace extg windows in kind. entry level add master bed, bath and laundry in extg storage. basement level -add 1/2 bath and family room in extg storage.Details
upper level - remodel kitchen, bath, replace extg windows in kind. entry level add master bed, bath and laundry in extg storage. basement level -add 1/2 bath and family room in extg storage. | $250,000 |
| Feb 26, 2016 | Never finaled filed Feb 2016, never issued | 38 Lippard Av | horizontal addition. interior & exterior renovation of an (e) three story house. horizontal addition at rear of the bldg at all three floors. addition of bedroom an bath at first flr.Details
horizontal addition. interior & exterior renovation of an (e) three story house. horizontal addition at rear of the bldg at all three floors. addition of bedroom an bath at first flr. | $200,000 |
| Jan 8, 2016 | Expired or cancelled withdrawn Mar 2016 | 139 Marietta Dr | interior remodel of upper level & entry level, new kitchen and bathroom finishes and fixtures. reconfigure existing interior staircase, high efficacy lighting.Details
interior remodel of upper level & entry level, new kitchen and bathroom finishes and fixtures. reconfigure existing interior staircase, high efficacy lighting. | $125,000 |
| Apr 24, 2015 | Expired or cancelled withdrawn Jun 2015 | 304 Moultrie St | remodel master bedroom add tub, & hall bathroom (like for like). relocate laundryDetails
remodel master bedroom add tub, & hall bathroom (like for like). relocate laundry | $30,000 |
| Jan 29, 2015 | Completed final sign-off Apr 2015 | 997 Dolores St | remodel of (2) half-baths into (2) full bathrooms within the same footprint. upgrade electrical, (2) new showers, (2) new wall hung toilets & (2) new sinks. replace (2) windows in-kind & add (2) new ceiling fans ducted to exterior wall. work in this unit only.Details
remodel of (2) half-baths into (2) full bathrooms within the same footprint. upgrade electrical, (2) new showers, (2) new wall hung toilets & (2) new sinks. replace (2) windows in-kind & add (2) new ceiling fans ducted to exterior wall. work in this unit only. | $20,000 |
| Apr 29, 2014 | Never finaled issued Oct 2014, no final | 120 Turquoise Wy | revision to approved permit #201308305734. work consists of interior upgrade, including bathrooms & kitchen, fireplace replacement & 3rd level master suite remodel, including added bulk & height. repair of (e) dryrot condition in exterior walls.Details
revision to approved permit #201308305734. work consists of interior upgrade, including bathrooms & kitchen, fireplace replacement & 3rd level master suite remodel, including added bulk & height. repair of (e) dryrot condition in exterior walls. | $30,000 |
| Feb 25, 2014 | Completed final sign-off Jun 2014 | 138 27th St | remodel of existing bathroom to combine 2 into 1.Details
remodel of existing bathroom to combine 2 into 1. | $40,000 |
| Dec 24, 2013 | Completed final sign-off Jun 2014 | 5 Starview Wy | interior remodel of kitchen & bath at 2nd floor. remodel of bath at ground floor & addition of closet.Details
interior remodel of kitchen & bath at 2nd floor. remodel of bath at ground floor & addition of closet. | $150,000 |
| Oct 30, 2013 | Completed final sign-off Apr 2015 | 106 Coleridge St | remove fireplace and brick chimney. remove non strucural partitions to create open plan kitchen. demolish cabinets, aplliances, finishes. install new cabinets, appliances, finishes, plumb/elec fixt in kitchen, bath no 2/4.replace e window with door,replace e window in kind at rear.new non struct parDetails
remove fireplace and brick chimney. remove non strucural partitions to create open plan kitchen. demolish cabinets, aplliances, finishes. install new cabinets, appliances, finishes, plumb/elec fixt in kitchen, bath no 2/4.replace e window with door,replace e window in kind at rear.new non struct par | $80,000 |
| Jul 19, 2013 | Never finaled issued Jul 2013, no final | 120 Turquoise Wy | revision to 2013-0401-3546. replace two windows - max u-factor = 0.40, modify first floor bathroom - add exit fan. insatll foundation drain and foundation upgrades.Details
revision to 2013-0401-3546. replace two windows - max u-factor = 0.40, modify first floor bathroom - add exit fan. insatll foundation drain and foundation upgrades. | $10,000 |
| Apr 5, 2013 | Completed final sign-off Sep 2013 | 119 Ortega St | reconfigure existing side yard openings, renovate kitchen & bath, minor structural reframing and repair.Details
reconfigure existing side yard openings, renovate kitchen & bath, minor structural reframing and repair. | $75,000 |
| Nov 14, 2012 | Completed final sign-off Oct 2013 | 3929 26th St | bathroom, kitchen & laundry room interior remodel-structural modifications including the removal of a interior wall, the replacemnet of windows & the addition of a door at the back (garden elevation) of the houseDetails
bathroom, kitchen & laundry room interior remodel-structural modifications including the removal of a interior wall, the replacemnet of windows & the addition of a door at the back (garden elevation) of the house | $50,000 |
| Nov 2, 2012 | Completed final sign-off Feb 2013 | 27 Mirabel Av | work in unit b: 1 kitchen and bathroom remodel. no structural changes. replacing fixtures in kind. lighting to comply with cec 150(k)Details
work in unit b: 1 kitchen and bathroom remodel. no structural changes. replacing fixtures in kind. lighting to comply with cec 150(k) | $12,500 |
| Oct 4, 2012 | Completed final sign-off Feb 2013 | 337 Ortega St | remodel of upper level - kitchen & bathroom. replace windows & exterior doors, skylights over entry, enclose tunnel entry. create new master ste at lower level. new furnace, relocate water heater, custom shower pan, add 785 sf of conditioned space in (e) basement.Details
remodel of upper level - kitchen & bathroom. replace windows & exterior doors, skylights over entry, enclose tunnel entry. create new master ste at lower level. new furnace, relocate water heater, custom shower pan, add 785 sf of conditioned space in (e) basement. | $86,000 |
| May 21, 2012 | Completed final sign-off Dec 2012 | 27 Mirabel Av | work at upper unit only - one kitchen remodel cabinets, appliances, sheetrock, 2 bathrooms remodel w/new fixtrues & sheetrock. no structural work , upgrade one window in kitchen, same size as current opening, window not facing street.Details
work at upper unit only - one kitchen remodel cabinets, appliances, sheetrock, 2 bathrooms remodel w/new fixtrues & sheetrock. no structural work , upgrade one window in kitchen, same size as current opening, window not facing street. | $55,000 |
| Dec 20, 2011 | Completed final sign-off Apr 2012 | 4 Ord Ct | excavate existing utility room floor in first floor t0 lower floor +/- 10", construct new 25 sq ft 1/2 bath. replace existing basement side entry door, no other exterior workDetails
excavate existing utility room floor in first floor t0 lower floor +/- 10", construct new 25 sq ft 1/2 bath. replace existing basement side entry door, no other exterior work | $35,000 |
| Nov 9, 2011 | Completed final sign-off Feb 2012 | 126 Dolores St | remodel two upper level bathrooms. strip all fixtures,wall & ceiling finishes & flooring. update with n finishes & fixtures. no structural work & no wall relocation. permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors-cec 150(k)10Details
remodel two upper level bathrooms. strip all fixtures,wall & ceiling finishes & flooring. update with n finishes & fixtures. no structural work & no wall relocation. permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors-cec 150(k)10 | $50,000 |
| Jul 26, 2011 | Completed final sign-off Mar 2012 | 208 Surrey St | interior remodel replacing stair from 1st to 2nd floor. add new bathroom to 2nd floor. new lighting, electrical and plmbg in area of remodel.Details
interior remodel replacing stair from 1st to 2nd floor. add new bathroom to 2nd floor. new lighting, electrical and plmbg in area of remodel. | $23,000 |
| Mar 21, 2011 | Completed final sign-off Jun 2011 | 1248 Treat Av | dryrot repairs, replace approx 300 sq.ft. of south side wall of kitchen, 1 x10 lap siding, replace in kind with new blg.paper, flashing, siding & trim. replace rotten framing in bedroom/bath subfloor & re-sheat with new glved & nailed down plywood, repair/replace other stud wall framing as necessaryDetails
dryrot repairs, replace approx 300 sq.ft. of south side wall of kitchen, 1 x10 lap siding, replace in kind with new blg.paper, flashing, siding & trim. replace rotten framing in bedroom/bath subfloor & re-sheat with new glved & nailed down plywood, repair/replace other stud wall framing as necessary | $10,000 |
| Jan 26, 2011 | Completed final sign-off Apr 2011 | 1248 Treat Av | kitchen and bathroom remodel:remove extg fixtures, cabinetry, counters, plaster and flooring. update with new. no structural work. lower unit.replace two windows in kind not visible from street. u factor 0.40 max. at least 50% high efficacy lighting by wattage.Details
kitchen and bathroom remodel:remove extg fixtures, cabinetry, counters, plaster and flooring. update with new. no structural work. lower unit.replace two windows in kind not visible from street. u factor 0.40 max. at least 50% high efficacy lighting by wattage. | $35,000 |
| Nov 23, 2010 | Completed final sign-off Mar 2011 | 227 03rd Av | minor interior remodel of (e) full bathroom & hallway to half bathroom & breakfast area. work area is 1st & 2nd floor. scope includes changing of an (e) exterior rear window & door. removal of a structural post per plans by geddes vlinskas architects dated 8/30/10Details
minor interior remodel of (e) full bathroom & hallway to half bathroom & breakfast area. work area is 1st & 2nd floor. scope includes changing of an (e) exterior rear window & door. removal of a structural post per plans by geddes vlinskas architects dated 8/30/10 | $8,500 |
| Oct 14, 2010 | Completed final sign-off Dec 2010 | 811 University St | 1/f bathroom remodel, remove all (e) fixtures, sheetrock & tile, install new fixtures, sheetrock & tile. no structural work. lighting to comply w/cec 150(k).Details
1/f bathroom remodel, remove all (e) fixtures, sheetrock & tile, install new fixtures, sheetrock & tile. no structural work. lighting to comply w/cec 150(k). | $15,000 |
| May 6, 2010 | Completed final sign-off Dec 2010 | 14 Guy Pl | 2nd floor master bathroom remodel. repalce bath, shower, sink, tile floor & walls. no structural work, new lighting must comply with cec 150 (k).Details
2nd floor master bathroom remodel. repalce bath, shower, sink, tile floor & walls. no structural work, new lighting must comply with cec 150 (k). | $25,000 |
| Jun 22, 2009 | Completed final sign-off Jul 2009 | 707 Douglass St | hall bathroom remodel- replace all fixtures, shower, vanity, sink. re-use existing w/c in same location, update electrical, no structural work, new exhaust fan, reference existing kitch. remodel permit 200905017474, lighting to meet title 24 energy codesDetails
hall bathroom remodel- replace all fixtures, shower, vanity, sink. re-use existing w/c in same location, update electrical, no structural work, new exhaust fan, reference existing kitch. remodel permit 200905017474, lighting to meet title 24 energy codes | $12,000 |
| Jun 24, 2008 | Completed final sign-off Oct 2008 | 336 Arlington St | remodel kitchen @ 2/f bathroom. no structural work, instlal new upper & lower cabinets, approx. 10 lena feet along s. wall, install island with new sink & dishwasher at center of kitchen. demo ex. pantry tomake space for new refrigerator. replace tub, sink & wc at bathroom.Details
remodel kitchen @ 2/f bathroom. no structural work, instlal new upper & lower cabinets, approx. 10 lena feet along s. wall, install island with new sink & dishwasher at center of kitchen. demo ex. pantry tomake space for new refrigerator. replace tub, sink & wc at bathroom. | $40,000 |
| Oct 11, 2006 | Completed final sign-off Dec 2006 | 57 Montezuma St | revision to pa# 200606194357. existing downstairs bathroom to remain as is. add railing to platform in garage.Details
revision to pa# 200606194357. existing downstairs bathroom to remain as is. add railing to platform in garage. | |
| Oct 11, 2005 | Completed final sign-off Oct 2007 | 73 Gladys St | bathroom addition, front stair replacement, horizontal enlargement.Details
bathroom addition, front stair replacement, horizontal enlargement. | $32,000 |
| Jan 5, 2005 | Completed final sign-off Jul 2005 | 432 Collingwood St | renovte rear west bathroom.repair warer damage, replace sheetrock, insulation, siding, 1 door, 3 winDetails
renovte rear west bathroom.repair warer damage, replace sheetrock, insulation, siding, 1 door, 3 win | $20,000 |