Back to bathroom remodel contractors
A K General
- Based in
- San Leandro
- On San Francisco permits
- Jul 2012 to Jul 2018
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 41 days from filing to permit and 418 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2013 | Completed final sign-off Feb 2015 | 736 44th Av | work @ 736 only. install hydronic heat. install laminate floor. insulate exterior wall on the inside. remodel bathrooms, remodel kitchen, new concrete slab on ground level. new stairs inside 1st level to ground level, remove wall between kitchen & living room. no exterior work, no windows.Details
work @ 736 only. install hydronic heat. install laminate floor. insulate exterior wall on the inside. remodel bathrooms, remodel kitchen, new concrete slab on ground level. new stairs inside 1st level to ground level, remove wall between kitchen & living room. no exterior work, no windows. | $57,250 |
| Nov 1, 2013 | Completed final sign-off Feb 2015 | 736 44th Av | interior renovations, no outside work, no windows. no lay out change. paint, new tile, new drywall, insulation living room, dining, bath, 2 bedrooms, no kitchen work, 5/8 drywall all inside exterior walls & ceiling.Details
interior renovations, no outside work, no windows. no lay out change. paint, new tile, new drywall, insulation living room, dining, bath, 2 bedrooms, no kitchen work, 5/8 drywall all inside exterior walls & ceiling. | $27,300 |
| Nov 28, 2012 | Never finaled issued Jan 2013, no final | 695 Los Palmos Dr | revision to pa# 201207094295. remove deck addtion at the rear yard. relocate gas meter, exterior door and stairway at the basement floor. relocate bathroom #2, #3 and laundry at the 1st floor. new workshop/storage & exercise room. add window at kitchen & bathroom #1. minor modificaiton at 1st fl.Details
revision to pa# 201207094295. remove deck addtion at the rear yard. relocate gas meter, exterior door and stairway at the basement floor. relocate bathroom #2, #3 and laundry at the 1st floor. new workshop/storage & exercise room. add window at kitchen & bathroom #1. minor modificaiton at 1st fl. |