A J O Group Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Mar 2018
- Last 24 months
- 0 permits filed
72 permits since 2000: 69 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 470 days from filing to permit and 38 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 8, 2016 | Completed final sign-off Nov 2017 | 4327 23rd St | comply with nov# 201624691. replace entirely (e) deteriorated rear deck @ 2nd floor. ground level deck less than 36". new 42" wood railing @ 3rd floor rear door.Details
comply with nov# 201624691. replace entirely (e) deteriorated rear deck @ 2nd floor. ground level deck less than 36". new 42" wood railing @ 3rd floor rear door. | $20,000 |
| Mar 19, 2015 | Expired or cancelled expired Apr 2019 | 2810 Washington St | remove patio and replace with new two cars garage and deck and one half bath.Details
remove patio and replace with new two cars garage and deck and one half bath. | $80,000 |