Back to bathroom remodel contractors
A J O Group Build Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Jan 2025
- Last 24 months
- 2 permits filed
148 permits since 2000: 125 completed, 14 never finaled, 9 expired or cancelled.
Of the 14 never-finaled permits, 14 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 8 completed, 6 never finaled, 1 expired or cancelled. Typically 10 days from filing to permit and 263 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 25, 2022 | Completed final sign-off Mar 2023 | 66 Stanyan St | revision to pa# 2022-0527-5167 change bathroom layout patio walls configuration and foundation along south property lineDetails
revision to pa# 2022-0527-5167 change bathroom layout patio walls configuration and foundation along south property line | $5,000 |
| May 27, 2022 | Completed final sign-off Mar 2023 | 66 Stanyan St | ground floor remodel with new family room, bathroom & wet bar. voluntary seismic upgrade at ground floor.Details
ground floor remodel with new family room, bathroom & wet bar. voluntary seismic upgrade at ground floor. | $95,000 |
| Nov 1, 2021 | Completed final sign-off Aug 2022 | 17 Elsie St | remodel (e) bathroom @ 2nd fl; add a hallway bathroom @ 2nd fl; replace (e) windows and door @ rear elevationDetails
remodel (e) bathroom @ 2nd fl; add a hallway bathroom @ 2nd fl; replace (e) windows and door @ rear elevation | $55,000 |
| Mar 15, 2021 | Completed final sign-off Oct 2021 | 776 Broadway | voluntary soft story retrofit. install 1 accessible bathroom. commercial portion of project)Details
voluntary soft story retrofit. install 1 accessible bathroom. commercial portion of project) | $32,000 |
| Mar 15, 2021 | Completed final sign-off Oct 2021 | 778 Broadway | voluntary soft story retrofit. install 1 accessible bathroom. (residential portion of project)Details
voluntary soft story retrofit. install 1 accessible bathroom. (residential portion of project) | $48,800 |
| Jan 27, 2021 | Expired or cancelled expired Jan 2023 | 2849 Fillmore St | open kitchen to living area. relocate (e) bathroom. coordinate closet with bathroom. vent kitchen & bathroom. fire rate garage under apartment. install lighting & outlets.Details
open kitchen to living area. relocate (e) bathroom. coordinate closet with bathroom. vent kitchen & bathroom. fire rate garage under apartment. install lighting & outlets. | $30,000 |
| Nov 12, 2020 | Never finaled filed Nov 2020, never issued | 31 Belmont Av | replace full brick founation, new g/f slab on grade, replace in-kind brick entry stairs,(n) interior stairs to g/f, add'l g/f space within building envelope:remodel 2/f & 3/f bathrooms, (n) 3/f laundry room,(n) new windows but no change to facade.Details
replace full brick founation, new g/f slab on grade, replace in-kind brick entry stairs,(n) interior stairs to g/f, add'l g/f space within building envelope:remodel 2/f & 3/f bathrooms, (n) 3/f laundry room,(n) new windows but no change to facade. | $110,000 |
| Jan 29, 2020 | Completed final sign-off Jul 2020 | 45 Grattan St | ground floor: add bathroom. replace 3 windows and add 1 window. no work visible from the street.Details
ground floor: add bathroom. replace 3 windows and add 1 window. no work visible from the street. | $25,000 |
| Apr 12, 2019 | Never finaled issued Jul 2020, no final | 1718 Hyde St | two adu @ grd flr per ord# 162-16 - convert (e) storage & mechnical rm into habitable space. remove interior stair and add (n) exterior stair. adu.1- 3 bed, 2 bath, kitchen & living rm. adu.2- 1 bed, 1 bath, kitchen, dining rm & living rm. (n) elect.Details
two adu @ grd flr per ord# 162-16 - convert (e) storage & mechnical rm into habitable space. remove interior stair and add (n) exterior stair. adu.1- 3 bed, 2 bath, kitchen & living rm. adu.2- 1 bed, 1 bath, kitchen, dining rm & living rm. (n) elect. | $280,000 |
| Mar 19, 2019 | Completed final sign-off Apr 2021 | 1061 Filbert St | remodel units #1, 3 & 4, repair sunroom wall on 1st fl unit #4. new lighting & electrical in remodel area. remodel kitchen & bathrooms. remove old water heater in unit #3 & #6.Details
remodel units #1, 3 & 4, repair sunroom wall on 1st fl unit #4. new lighting & electrical in remodel area. remodel kitchen & bathrooms. remove old water heater in unit #3 & #6. | $150,000 |
| Mar 7, 2019 | Never finaled issued Mar 2019, no final | 1504 Florida St | remodel kitchen and one bathroom. no change in wall layout & opening.Details
remodel kitchen and one bathroom. no change in wall layout & opening. | $40,000 |
| Mar 7, 2019 | Never finaled issued Mar 2019, no final | 1506 Florida St | remodel kitchen and one bathroom. no change in wall layout & opening.Details
remodel kitchen and one bathroom. no change in wall layout & opening. | $40,000 |
| Mar 7, 2019 | Never finaled issued Mar 2019, no final | 1502 Florida St | remodel kitchen and one bathroom. no change in wall layout & opening.Details
remodel kitchen and one bathroom. no change in wall layout & opening. | $40,000 |
| Mar 7, 2019 | Never finaled issued Mar 2019, no final | 1508 Florida St | remodel kitchen and one bathroom. no change in wall layout & opening.Details
remodel kitchen and one bathroom. no change in wall layout & opening. | $40,000 |
| Mar 1, 2019 | Completed final sign-off Aug 2023 | 196 Urbano Dr | conversion of (e) basement space to living space by way of excavation. converted space to include (n) family room, bathroom, study. remodel (e) 1st flr kitchen.Details
conversion of (e) basement space to living space by way of excavation. converted space to include (n) family room, bathroom, study. remodel (e) 1st flr kitchen. | $164,000 |