Back to bathroom remodel contractors
A H B Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2019 to Jan 2026
- Last 24 months
- 1 permit filed
5 permits since 2000: 3 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 1, 2022 | Never finaled issued Nov 2022, no final | 1907 Leavenworth St | renovation of bathroom replacement of tub walls, toilet, vanity, sink, and tile flooring. relocation of recepticles and switches, lights. kitchen cabinet update relocation of light, switches, and receptales cabinet lighting. upate non complaint panael to compliant location. if needed. pull new lead.Details
renovation of bathroom replacement of tub walls, toilet, vanity, sink, and tile flooring. relocation of recepticles and switches, lights. kitchen cabinet update relocation of light, switches, and receptales cabinet lighting. upate non complaint panael to compliant location. if needed. pull new lead. | $50,000 |