Back to bathroom remodel contractors
A F General Contractors Inc
- Based in
- San Jose
- On San Francisco permits
- Mar 2016 to Nov 2024
- Last 24 months
- 1 permit filed
14 permits since 2000: 13 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 53 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 13, 2024 | Completed final sign-off Jul 2025 | 1520 Taylor St | remodel 2 bathroom, convert 1st bathroom: bath tub to floor shower 2nd bath: replace toilet,tile and vanity kitchen: replace cabinets and counter top all replaced in the same placeDetails
remodel 2 bathroom, convert 1st bathroom: bath tub to floor shower 2nd bath: replace toilet,tile and vanity kitchen: replace cabinets and counter top all replaced in the same place | $55,800 |
| Oct 27, 2023 | Completed final sign-off Dec 2023 | 201 Harrison St | unit #212: remodel (1) bathroom- replace sink, toilet, tile.Details
unit #212: remodel (1) bathroom- replace sink, toilet, tile. | $9,700 |
| Feb 4, 2022 | Completed final sign-off Mar 2022 | 1 Daniel Burnham Ct | replace kitchen cabinets, counter top, bathroom tiles & shower head, keep (e) tub, replace vanity, paintDetails
replace kitchen cabinets, counter top, bathroom tiles & shower head, keep (e) tub, replace vanity, paint | $14,700 |
| Dec 2, 2021 | Completed final sign-off Jan 2022 | 105 Liberty St | shower (n) tile. kitchen counter top replace only. add (n) sink in bathroom, replace shower head onlyDetails
shower (n) tile. kitchen counter top replace only. add (n) sink in bathroom, replace shower head only | $15,000 |
| Jun 15, 2018 | Completed final sign-off Apr 2019 | 688 Clipper St | interior remodel: reconfig kitchen & poweder @2/f, reconfig master bath @3/f, rpelace fixtures & finishes at 2 baths on 1/f, new windows & door throughout. exterior: reconfig rear doors & windows @1st, 2nd, 3rd. replace tile & railing at rear decks. new wndow at stairwell. new railing at front stairDetails
interior remodel: reconfig kitchen & poweder @2/f, reconfig master bath @3/f, rpelace fixtures & finishes at 2 baths on 1/f, new windows & door throughout. exterior: reconfig rear doors & windows @1st, 2nd, 3rd. replace tile & railing at rear decks. new wndow at stairwell. new railing at front stair | $150,000 |