Back to bathroom remodel contractors
A C Contracting
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Feb 2022
- Last 24 months
- 0 permits filed
39 permits since 2000: 23 completed, 9 never finaled, 7 expired or cancelled.
Of the 9 never-finaled permits, 3 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 6, 2018 | Completed final sign-off Sep 2018 | 1420 Hudson Av | cabinets back in-kind w/ countertop, replace light fixts & recepticals. replace tub & tile in bathroom, replace fixts in bathroom. paint & sand & stain floors.Details
cabinets back in-kind w/ countertop, replace light fixts & recepticals. replace tub & tile in bathroom, replace fixts in bathroom. paint & sand & stain floors. | $125,000 |
| Jun 1, 2018 | Completed final sign-off Sep 2018 | 45 Glover St | interior remodel - remove and replace fixtures & finishes: 3 full bathrooms, 2 half bath; kitchen only. fixtures in same locations througout. no structural work. no framing alterations no exterior work.Details
interior remodel - remove and replace fixtures & finishes: 3 full bathrooms, 2 half bath; kitchen only. fixtures in same locations througout. no structural work. no framing alterations no exterior work. | $265,000 |
| Feb 4, 2008 | Never finaled issued Feb 2008, no final | 350 Laguna Honda Bl | apt. #6: upgrade kitchen & bathroom - remodel - no structural work, paint, sand floors entire apt. new lighting fixtures 50% high efficacy min in kitchen. high efficacy or manual on/auto off switch in bathroom.Details
apt. #6: upgrade kitchen & bathroom - remodel - no structural work, paint, sand floors entire apt. new lighting fixtures 50% high efficacy min in kitchen. high efficacy or manual on/auto off switch in bathroom. | $16,000 |