Back to bathroom remodel contractors
A C B Inc
- Based in
- San Franicsco
- On San Francisco permits
- Oct 2004 to Sep 2026
- Last 24 months
- 3 permits filed
51 permits since 2000: 45 completed, 1 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 16 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2024 | Completed final sign-off Apr 2024 | 2731 41st Av | in-kind bathroom remodel. same fixture locations. approx. 32 sq.ft. demo-(e) tile. remove (e) toilet and sink. install hardy backer and install new tile in bathroom. paint bathroom. install glass panel shower door. replace shower valve and install bathtub back. bath tub valve and drain pipe.Details
in-kind bathroom remodel. same fixture locations. approx. 32 sq.ft. demo-(e) tile. remove (e) toilet and sink. install hardy backer and install new tile in bathroom. paint bathroom. install glass panel shower door. replace shower valve and install bathtub back. bath tub valve and drain pipe. | $12,000 |
| May 26, 2021 | Completed final sign-off Aug 2021 | 788 21st Av | new bathroom, new closetDetails
new bathroom, new closet | $12,000 |
| Jun 27, 2018 | Completed final sign-off May 2019 | 762 42nd Av | remodel kitchen and 2 baths, new bedroom, new bathroom. no work on ground floor of exterior bldg.Details
remodel kitchen and 2 baths, new bedroom, new bathroom. no work on ground floor of exterior bldg. | $50,000 |
| Apr 24, 2017 | Completed final sign-off Sep 2017 | 1818 39th Av | remodling kitchen, and two bathrooms. no layout changes.Details
remodling kitchen, and two bathrooms. no layout changes. | $25,000 |
| Jul 21, 2016 | Completed final sign-off Dec 2016 | 655 Corbett Av | #204 - remodel bathroom ; add new washer & electrical dryer hook up.Details
#204 - remodel bathroom ; add new washer & electrical dryer hook up. | $9,000 |
| Mar 16, 2016 | Completed final sign-off Mar 2017 | 630 23rd Av | new pwder room on 2nd flr, remodel bathroom on 2nd. remodel 2 bedroomd on 3rd, new walk-in closet in master. remodel kitchen. new laundryDetails
new pwder room on 2nd flr, remodel bathroom on 2nd. remodel 2 bedroomd on 3rd, new walk-in closet in master. remodel kitchen. new laundry | $80,000 |
| Aug 6, 2013 | Completed final sign-off Jan 2014 | 3264 Folsom St | kitchen remodels on 2/f, new cabinets, new plumbing & electrical fixtures, new flooring. add new bathroom with laundry hookups, install toilet, shower & double sink vanity.Details
kitchen remodels on 2/f, new cabinets, new plumbing & electrical fixtures, new flooring. add new bathroom with laundry hookups, install toilet, shower & double sink vanity. | $18,000 |
| May 2, 2013 | Completed final sign-off Nov 2013 | 65 Stanyan St | 631 sq ft conversion of garage into 2 bedrooms, bath, closet and laundry. extg furnace will be replaced 2nd floor hallway. conversion into new walking closet and new half bath. extg kichen remodel and bath #1 remodeled. revision to app#201303252945Details
631 sq ft conversion of garage into 2 bedrooms, bath, closet and laundry. extg furnace will be replaced 2nd floor hallway. conversion into new walking closet and new half bath. extg kichen remodel and bath #1 remodeled. revision to app#201303252945 | $25,000 |
| Mar 25, 2013 | Completed final sign-off Oct 2013 | 65 Stanyan St | 1 kitchen & 1 bathroom remodel. new cabinets, new plumbing & electrical fixtures. new wall & floor tiles.Details
1 kitchen & 1 bathroom remodel. new cabinets, new plumbing & electrical fixtures. new wall & floor tiles. | $170,000 |
| Apr 23, 2012 | Completed final sign-off Aug 2012 | 131 08th St | remodel wet bar- kitchenette at the upper floor, new plumbing fixtures at all bathroom, remodel upper floor bathroom, laundry hook up in basement, new light fixtures, new flooring, paint, tile, no wall relocation.Details
remodel wet bar- kitchenette at the upper floor, new plumbing fixtures at all bathroom, remodel upper floor bathroom, laundry hook up in basement, new light fixtures, new flooring, paint, tile, no wall relocation. | $35,000 |
| Feb 29, 2012 | Completed final sign-off Mar 2012 | 649 Guerrero St | bathroom remodel on 2nd floor, wahser/dryer hook up, new bathtub, new vanity, new plumbing and electrical fixtures, wall & floor tile.Details
bathroom remodel on 2nd floor, wahser/dryer hook up, new bathtub, new vanity, new plumbing and electrical fixtures, wall & floor tile. | $10,000 |
| Jan 30, 2012 | Completed final sign-off Apr 2012 | 1842 44th Av | kitchen & bathroom remodel on 2nd floor. new cabinets, new plumbing & electrical fixtures, new wall & floor tiles. no wall relocation.Details
kitchen & bathroom remodel on 2nd floor. new cabinets, new plumbing & electrical fixtures, new wall & floor tiles. no wall relocation. | $20,000 |
| Jun 22, 2009 | Expired or cancelled cancelled Mar 2011 | 73 Florentine Av | horizontal addition, expand (e) bldg.toward rear of the property line @ 1st level. build roof deck, remodel (e) 1st floor for habitable space. (n) office, (n) living, (n) bedroom, full bathroom, (n) laundry & closets.Details
horizontal addition, expand (e) bldg.toward rear of the property line @ 1st level. build roof deck, remodel (e) 1st floor for habitable space. (n) office, (n) living, (n) bedroom, full bathroom, (n) laundry & closets. | $70,000 |
| Feb 23, 2009 | Completed final sign-off Mar 2009 | 120 Shakespeare St | bathroom floor repair. area of repair is approx 25 sq. ft.Details
bathroom floor repair. area of repair is approx 25 sq. ft. | $750 |
| Aug 25, 2006 | Completed final sign-off Jan 2007 | 545 34th Av | replace tile & fixtures in a bathroom, replace cabinets, fixtures in a kitchen.Details
replace tile & fixtures in a bathroom, replace cabinets, fixtures in a kitchen. | $14,000 |
| Jul 17, 2006 | Completed final sign-off Oct 2006 | 545 34th Av | replace tile & fixtures in a bathroom. work on 545 34th ave only.Details
replace tile & fixtures in a bathroom. work on 545 34th ave only. | $2,000 |
| Oct 7, 2004 | Completed final sign-off Jan 2005 | 545 34th Av | relocation of existing laundry,installation of new furnace, legalisation of existing full bathrooms*Details
relocation of existing laundry,installation of new furnace, legalisation of existing full bathrooms* | $3,000 |