A -1 Roof Management & Construction, Inc
- Based in
- Fremont
- On San Francisco permits
- Aug 2009 to Sep 2026
- Last 24 months
- 4 permits filed
166 permits since 2000: 133 completed, 1 in progress, 24 never finaled, 8 expired or cancelled.
Of the 24 never-finaled permits, 2 are 3 to 5 years old, 10 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
13 deck permits: 9 completed, 3 never finaled, 1 expired or cancelled. Typically 21 days from filing to permit and 147 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 27, 2022 | Completed final sign-off Jan 2023 | 790 07th Av | dry rot repairs on front decks, like for like. less than 50% repair. revision to pa# 202202238560Details
dry rot repairs on front decks, like for like. less than 50% repair. revision to pa# 202202238560 | $94,000 |
| Feb 23, 2022 | Completed final sign-off Jan 2023 | 790 07th Av | common area only: revision to bpa# 202106162533. dry rot repairs on common area back deck (1) like for like. less than 50% repair.Details
common area only: revision to bpa# 202106162533. dry rot repairs on common area back deck (1) like for like. less than 50% repair. | $15,000 |
| Dec 7, 2018 | Completed final sign-off Feb 2019 | 143 Lake Merced Hill St South St | repair and replace 2nd floor deck (less than 50%)Details
repair and replace 2nd floor deck (less than 50%) | $3,500 |
| Nov 21, 2018 | Completed final sign-off Jul 2020 | 1205 04th Av | minor wood framing repair at wood deck and common stair beam. less than 50%. to comply w/his nov #201787731, dated 7/3/2017, item #7Details
minor wood framing repair at wood deck and common stair beam. less than 50%. to comply w/his nov #201787731, dated 7/3/2017, item #7 | $20,000 |
| Jul 11, 2018 | Completed final sign-off Feb 2019 | 149 Lake Merced Hill St South St | repair of 2nd floor rear deck (less than 50% to be replaced)Details
repair of 2nd floor rear deck (less than 50% to be replaced) | $35,000 |
| Jul 11, 2018 | Completed final sign-off Feb 2019 | 151 Lake Merced Hill St South St | repair of 2nd floor rear deck (less than 50% to be replaced)Details
repair of 2nd floor rear deck (less than 50% to be replaced) | $3,500 |
| Jul 11, 2018 | Expired or cancelled cancelled Dec 2018 | 147 Lake Merced Hill St South St | repair of 2nd floor rear deck (less than 50% to be replaced)Details
repair of 2nd floor rear deck (less than 50% to be replaced) | $3,500 |
| Jul 11, 2018 | Completed final sign-off Feb 2019 | 145 Lake Merced Hill St South St | repair of 2nd floor rear deck (less than 50% to be replaced)Details
repair of 2nd floor rear deck (less than 50% to be replaced) | $35,000 |
| Jul 11, 2018 | Completed final sign-off Feb 2019 | 141 Lake Merced Hill St South St | repair of 2nd floor rear deck (less than 50% to be replaced)Details
repair of 2nd floor rear deck (less than 50% to be replaced) | $3,500 |
| Jan 19, 2018 | Never finaled issued Jan 2018, no final | 5600 03rd St | temporary shore (e) deck framing @ 5th floor due to dry rot & earthquake damage (life safety). rebuilt of deck @ 5th floor under future permit.Details
temporary shore (e) deck framing @ 5th floor due to dry rot & earthquake damage (life safety). rebuilt of deck @ 5th floor under future permit. | $8,000 |
| Jul 20, 2016 | Never finaled issued Jul 2016, no final | 10 Amber Dr | deck repair for structural strengthening of (e) deck at unit 10 (in-kind)Details
deck repair for structural strengthening of (e) deck at unit 10 (in-kind) | $10,000 |
| Jun 29, 2016 | Never finaled issued Jul 2016, no final | 12 Amber Dr | eck repair, structural strengthening, (e) decks at unit 12, less than 50% in-kind. revision to bpa#201603253138Details
eck repair, structural strengthening, (e) decks at unit 12, less than 50% in-kind. revision to bpa#201603253138 | $10,000 |
| Jun 9, 2014 | Completed final sign-off Aug 2014 | 2407 Harrison St | #15. remove 8'x8' area to expose wood deck, remove 3'x10' to allow damaged decking. re-install wall 3 flooring in a like for like manner to resemble existing. not to exceed 64 sq ft of sub replacement.Details
#15. remove 8'x8' area to expose wood deck, remove 3'x10' to allow damaged decking. re-install wall 3 flooring in a like for like manner to resemble existing. not to exceed 64 sq ft of sub replacement. | $9,000 |