A-1 Dynamic Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2018 to Jul 2026
- Last 24 months
- 6 permits filed
43 permits since 2000: 29 completed, 6 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
6 deck permits: 4 completed, 1 in progress, 1 never finaled. Typically 44 days from filing to permit and 378 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2025 | In progress issued Dec 2025 | 3713 Lawton St | addition new adu; add roof decks along east and west w/interior space created within the new barrel vault roof. new barrel vault roof will exceed 35ft height limit by measurement equal to 50% said height limit to finihsed floor; add rear bump outs to 2/f & 3/f; add rear decks. move front door.Details
addition new adu; add roof decks along east and west w/interior space created within the new barrel vault roof. new barrel vault roof will exceed 35ft height limit by measurement equal to 50% said height limit to finihsed floor; add rear bump outs to 2/f & 3/f; add rear decks. move front door. | $450,000 |
| Oct 19, 2023 | Completed final sign-off Oct 2024 | 630 Moscow St | enclose light court. remodel kitchen and a bathroom, add a full bath on the 2nd fl. add a rear deck access from 2nd fl. add two bedrooms, a media rm, two full baths on the 1st fl. upgrade main service to 200 amp. new furnace & takless wh. two new skylights.Details
enclose light court. remodel kitchen and a bathroom, add a full bath on the 2nd fl. add a rear deck access from 2nd fl. add two bedrooms, a media rm, two full baths on the 1st fl. upgrade main service to 200 amp. new furnace & takless wh. two new skylights. | $140,000 |
| Aug 22, 2023 | Completed final sign-off Jan 2024 | 1839 26th Av | to comply with nov# 202307090. new rear deck.Details
to comply with nov# 202307090. new rear deck. | $8,500 |
| Nov 16, 2022 | Completed final sign-off Mar 2024 | 1127 Moraga St | relocate kitchen, remodel bathroom, add new bathroom and remove light court on the 2nd fl. replace deck off 2nd fl. add family rm w/ wet bar, bedroom, media rm, and bathroom on the 1st fl. relocated furnace, water heater, washer/dryer. install (2) skylights.Details
relocate kitchen, remodel bathroom, add new bathroom and remove light court on the 2nd fl. replace deck off 2nd fl. add family rm w/ wet bar, bedroom, media rm, and bathroom on the 1st fl. relocated furnace, water heater, washer/dryer. install (2) skylights. | $150,000 |
| Jul 14, 2022 | Completed final sign-off Oct 2023 | 557 Duncan St | 1st fl: convert (e) bedroom, office, and laundry room to kitchen, living room & dining room. add new half bath. 2nd fl: convert (e) living room to master suite including new bathroom with skylight. remove (e) rear deck and replace with (n) cantilevered decks within rear yard.Details
1st fl: convert (e) bedroom, office, and laundry room to kitchen, living room & dining room. add new half bath. 2nd fl: convert (e) living room to master suite including new bathroom with skylight. remove (e) rear deck and replace with (n) cantilevered decks within rear yard. | $250,000 |
| Jun 5, 2020 | Never finaled issued Dec 2021, no final | 626 Banks St | create one new adu (accessory dwelling unit) per ordinance no. 162-16. at ground floor of existing singe family dwelling. modify the interior of the existing second floor kitchen, provide new second floor exterior deck and exterior stair to rear yard.Details
create one new adu (accessory dwelling unit) per ordinance no. 162-16. at ground floor of existing singe family dwelling. modify the interior of the existing second floor kitchen, provide new second floor exterior deck and exterior stair to rear yard. | $75,000 |