Back to bathroom remodel contractors
A-1 Construction Co
- Based in
- Daly City
- On San Francisco permits
- Jul 2001 to Oct 2015
- Last 24 months
- 0 permits filed
42 permits since 2000: 40 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 15 completed. Typically 0 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 22, 2010 | Completed final sign-off Apr 2010 | 935 Burnett Av | apt#2, 2nd floor. replace (e) kitchen incl. base, wall cabs, counter top/sink,g=faucet,tile flooring. replace bathroom incl. bath tub, toilet,sink, faucet, wall tiles and flooring tilesDetails
apt#2, 2nd floor. replace (e) kitchen incl. base, wall cabs, counter top/sink,g=faucet,tile flooring. replace bathroom incl. bath tub, toilet,sink, faucet, wall tiles and flooring tiles | $13,000 |
| Nov 26, 2008 | Completed final sign-off Oct 2009 | 1232 Anza St | remodel extg kitchen and bathrooms, add one new bathroom in both units. remove non bearing walls and mics. items. replace (1st) storage room walls in basement. (2nd) extg storage room in rear wall to be removed. replace (e) garage door. elect/plumbing on separate permit.Details
remodel extg kitchen and bathrooms, add one new bathroom in both units. remove non bearing walls and mics. items. replace (1st) storage room walls in basement. (2nd) extg storage room in rear wall to be removed. replace (e) garage door. elect/plumbing on separate permit. | $80,000 |
| Nov 20, 2008 | Completed final sign-off Dec 2008 | 1932 Fell St | work @ apt#7.replace/install existing kitchen cabinets/counter top/ replace bathroom wall tiles/tile floor.Details
work @ apt#7.replace/install existing kitchen cabinets/counter top/ replace bathroom wall tiles/tile floor. | $17,000 |
| Nov 6, 2008 | Completed final sign-off Feb 2009 | 1053 Bush St | unit #17: remodel kitchen. min. 50% of kitchen light watts must be from high efficiency lights, replace cabinets, patch and paint walls, lights in bath must be high efficiency lights or controlled, replace bathroom tiles by manual on occupancy sensors, repair floorDetails
unit #17: remodel kitchen. min. 50% of kitchen light watts must be from high efficiency lights, replace cabinets, patch and paint walls, lights in bath must be high efficiency lights or controlled, replace bathroom tiles by manual on occupancy sensors, repair floor | $24,000 |
| Jul 14, 2008 | Completed final sign-off May 2009 | 77 07th Av | remodel 5 kichens and install counters/counter top. replace sheetrock as needed, install new tiles walls and floors in 5 bathroomsDetails
remodel 5 kichens and install counters/counter top. replace sheetrock as needed, install new tiles walls and floors in 5 bathrooms | $200,000 |
| Jul 3, 2008 | Completed final sign-off Sep 2008 | 2936 22nd St | increase addition work $90000 for kichen & bathrooms. ref pa# 2007/09/21/3430.Details
increase addition work $90000 for kichen & bathrooms. ref pa# 2007/09/21/3430. | $90,000 |
| Dec 11, 2007 | Completed final sign-off Mar 2008 | 1932 Fell St | work @ unit# 2 only. replace (e) kitchen cabinets & replace bathroom shower tile walls & flooring. no structural work. no new lighting fixtures.Details
work @ unit# 2 only. replace (e) kitchen cabinets & replace bathroom shower tile walls & flooring. no structural work. no new lighting fixtures. | $11,000 |
| Dec 11, 2007 | Completed final sign-off Jun 2008 | 3451 26th St | remove kitchens & bathrooms. 4 kitchen & 4 baths total. no structural work. florescent lighting or manual on auto off switch. 50% fluorescent in kitchens.Details
remove kitchens & bathrooms. 4 kitchen & 4 baths total. no structural work. florescent lighting or manual on auto off switch. 50% fluorescent in kitchens. | $80,000 |
| Sep 21, 2007 | Completed final sign-off Dec 2007 | 1932 Fell St | work on unit#10. replace kitchen countertop, cabinets, floor tiles and bathroom flooring tiles only, no bathroom fixtures replaced. to comply with tile 24 energy codes.Details
work on unit#10. replace kitchen countertop, cabinets, floor tiles and bathroom flooring tiles only, no bathroom fixtures replaced. to comply with tile 24 energy codes. | $10,000 |
| Apr 3, 2007 | Completed final sign-off Jul 2007 | 1932 Fell St | replace kitchen cabinets, countertop and replace and retile bathroom tilesDetails
replace kitchen cabinets, countertop and replace and retile bathroom tiles | $4,000 |
| Feb 1, 2007 | Completed final sign-off Jul 2007 | 1932 Fell St | replace extg kchn base cabin and wall cabinets. replace bath room tiles gloor and kcn counter topDetails
replace extg kchn base cabin and wall cabinets. replace bath room tiles gloor and kcn counter top | $8,000 |
| Oct 13, 2006 | Completed final sign-off Aug 2007 | 1932 Fell St | unit #3,#5,#8,#9,#11.replace (e) kitchens cabinets and tiles floors. replace bathrooms tiles walls and floor. no changes to partions or window/at 5 units listed avove.Details
unit #3,#5,#8,#9,#11.replace (e) kitchens cabinets and tiles floors. replace bathrooms tiles walls and floor. no changes to partions or window/at 5 units listed avove. | $35,000 |
| Apr 21, 2006 | Completed final sign-off Jun 2006 | 3519 Sacramento St | bathroom upgrade-new vanity, medicine cabinet & tile floor. not full remodel only what is stated.Details
bathroom upgrade-new vanity, medicine cabinet & tile floor. not full remodel only what is stated. | $4,000 |
| Feb 15, 2002 | Completed final sign-off Sep 2002 | 2134 12th Av | basement room to be remodel to new family room & relocate exist bath room to right side.Details
basement room to be remodel to new family room & relocate exist bath room to right side. | $15,000 |
| Jul 9, 2001 | Completed final sign-off Feb 2002 | 163 Skyview Wy | interior renovation, including a full bathroom of basement space within a single family houseDetails
interior renovation, including a full bathroom of basement space within a single family house | $6,000 |