Back to bathroom remodel contractors
8 Success Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Aug 2025
- Last 24 months
- 4 permits filed
19 permits since 2000: 17 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 0 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2025 | Completed final sign-off Dec 2025 | 1008 Treat Av | one bathroom, one kitchen remodeling ( in kind) at main floor. kitchen approx. 120 sq ft. bathroom approx. 45 sq ft. add a subpanel in the hallway, rewire the house. replace (7) windows - (3 windows in the front, 4 windows in the back). all windows to be replaced in kind in existing openings.Details
one bathroom, one kitchen remodeling ( in kind) at main floor. kitchen approx. 120 sq ft. bathroom approx. 45 sq ft. add a subpanel in the hallway, rewire the house. replace (7) windows - (3 windows in the front, 4 windows in the back). all windows to be replaced in kind in existing openings. | $92,500 |
| Apr 15, 2025 | Completed final sign-off Jul 2025 | 1750 46th Av | remodel kitchen and bathroom.Details
remodel kitchen and bathroom. | $35,000 |
| Dec 7, 2018 | Completed final sign-off Jul 2019 | 201 Shields St | remodel kitchen and 2 baths on the 2nd fl add a laundry room 2 bedrooms w full baths 1st fl replace furnaceDetails
remodel kitchen and 2 baths on the 2nd fl add a laundry room 2 bedrooms w full baths 1st fl replace furnace | $80,000 |
| Aug 25, 2015 | Completed final sign-off Feb 2017 | 4400 Pacheco St | comply with complaint 201389401; 1st flr, add 3 bedrooms, 3 full bath, 2nd flr: remodel (e) bath & add one bath, 3rd flr: remodel (e) bath, legalize one bath & add one bath per plan. add windows at side.Details
comply with complaint 201389401; 1st flr, add 3 bedrooms, 3 full bath, 2nd flr: remodel (e) bath & add one bath, 3rd flr: remodel (e) bath, legalize one bath & add one bath per plan. add windows at side. | $86,000 |
| Aug 24, 2015 | Completed final sign-off Aug 2017 | 1008 Treat Av | bathroom, kitchen remodelling; high efficacy lighting (e) exhaust to remain. n/a maher ord. 155-13Details
bathroom, kitchen remodelling; high efficacy lighting (e) exhaust to remain. n/a maher ord. 155-13 | $18,000 |
| Jul 20, 2015 | Completed final sign-off Feb 2017 | 4400 Pacheco St | one bathroom remodel. non-structural.Details
one bathroom remodel. non-structural. | $6,000 |
| Feb 23, 2015 | Completed final sign-off Sep 2016 | 555 07th Av | change cabinets, counter top, sink, faucet, floor tile in the kitchen. remodeling 2 bathrooms.Details
change cabinets, counter top, sink, faucet, floor tile in the kitchen. remodeling 2 bathrooms. | $16,000 |
| Jun 9, 2014 | Completed final sign-off Jun 2014 | 100 Sargent St | replace bathroom window with fibergalss sash within existing openning.Details
replace bathroom window with fibergalss sash within existing openning. | $400 |
| May 12, 2014 | Completed final sign-off Sep 2014 | 2728 Ulloa St | remodel kitchen and 2 bathrooms, add 1 bathroom, add partition wall on 2/f, add 3 bedrooms, 1 exercise room and 4 bathrooms on 1/f, new furnace and new water heater.Details
remodel kitchen and 2 bathrooms, add 1 bathroom, add partition wall on 2/f, add 3 bedrooms, 1 exercise room and 4 bathrooms on 1/f, new furnace and new water heater. | $95,000 |
| May 1, 2014 | Completed final sign-off Jun 2014 | 100 Sargent St | change cabinet & countertop in kitchen; change floor tiles in the kitchen; change vanity cabinet & tiles in the bathroom. to comply with cec150(k) 8Details
change cabinet & countertop in kitchen; change floor tiles in the kitchen; change vanity cabinet & tiles in the bathroom. to comply with cec150(k) 8 | $7,000 |
| Dec 23, 2013 | Completed final sign-off Feb 2014 | 2875 25th St | remodeling one bathroom non structuralDetails
remodeling one bathroom non structural | $6,000 |