Back to bathroom remodel contractors
415 Remodeling Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2016 to Sep 2026
- Last 24 months
- 18 permits filed
109 permits since 2000: 91 completed, 8 in progress, 9 never finaled, 1 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 5 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
41 bathroom remodel permits: 32 completed, 3 in progress, 5 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 191 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | In progress issued Sep 2026 | 2672 Filbert St | interior remodel of guest bath basement, remove tub & install shower. interior remodel of bathroom #2, 3, & 4. total (4) bathrooms. bath #4 removing non structural wall between water closet & shower stall. bath 2 & 3 remodel in kind.Details
interior remodel of guest bath basement, remove tub & install shower. interior remodel of bathroom #2, 3, & 4. total (4) bathrooms. bath #4 removing non structural wall between water closet & shower stall. bath 2 & 3 remodel in kind. | $125,000 |
| Jul 27, 2026 | In progress issued Jul 2026 | 2474 23rd Av | interior remodel of 1st floor, demo 1st floor bath & laundry, (n) 1st floor bath & laundry, (n) closet at (e) bedroom.Details
interior remodel of 1st floor, demo 1st floor bath & laundry, (n) 1st floor bath & laundry, (n) closet at (e) bedroom. | $100,000 |
| Jul 13, 2026 | In progress issued Jul 2026 | 481 Jersey St | add cabinets to butlers pantry; add partition wall to (e) closet/bathroom space. (n) electrical; plumbing, to (e) closet/bathroom space. (n) electrical; plumbing, and hvac work to be pulled on separate permits.Details
add cabinets to butlers pantry; add partition wall to (e) closet/bathroom space. (n) electrical; plumbing, to (e) closet/bathroom space. (n) electrical; plumbing, and hvac work to be pulled on separate permits. | $20,000 |
| Mar 24, 2026 | Completed final sign-off May 2026 | 59 Newburg St | partial bathroom remodel, replace bathroom shower stall in kind. like for like. repair tiles around shower.Details
partial bathroom remodel, replace bathroom shower stall in kind. like for like. repair tiles around shower. | $5,000 |
| Jan 17, 2025 | Completed final sign-off Apr 2026 | 253 Frederick St | kitchen and bathroom remodel, w/c replace, remodel closet in dressing room. widen room opening between kitchen & dining rm. add room opening from dining room to living room, close extg living room entrance & add new 6' doorway opening into living room. close existing mud room entrance &Details
kitchen and bathroom remodel, w/c replace, remodel closet in dressing room. widen room opening between kitchen & dining rm. add room opening from dining room to living room, close extg living room entrance & add new 6' doorway opening into living room. close existing mud room entrance & | $75,000 |
| Aug 13, 2024 | Completed final sign-off Dec 2024 | 2363 46th Av | remodel upper level bathroom. remove the tub, reconfigure shower, add closet in (e) bath footprint. no work outside of upper level bathroom.Details
remodel upper level bathroom. remove the tub, reconfigure shower, add closet in (e) bath footprint. no work outside of upper level bathroom. | $15,000 |
| May 26, 2023 | Completed final sign-off Mar 2025 | 375 Highland Av | revision to pa# 202107094083. inclusion of demo plan for record as per field inspector. revision to interior layouts for kitchen and bath at level 2 and bathroom at level 1. minor field clarifications to floor framing and simpson strong walls.Details
revision to pa# 202107094083. inclusion of demo plan for record as per field inspector. revision to interior layouts for kitchen and bath at level 2 and bathroom at level 1. minor field clarifications to floor framing and simpson strong walls. | |
| Feb 15, 2023 | Never finaled issued Mar 2023, no final | 173 Crestmont Dr | 1st fl: remodel bath 2, remodel office bonus room, add wet bar and add mud room 2nd fl: remodel bath 1 in kind remodel primary bath room reface fire place with gas fire place (n) elec throughout windows: replace (e) double hung window w/fixed privacy window in (e) loc replace 2 (e) 3-panelDetails
1st fl: remodel bath 2, remodel office bonus room, add wet bar and add mud room 2nd fl: remodel bath 1 in kind remodel primary bath room reface fire place with gas fire place (n) elec throughout windows: replace (e) double hung window w/fixed privacy window in (e) loc replace 2 (e) 3-panel | $100,000 |
| Sep 23, 2022 | Completed final sign-off Nov 2023 | 651 29th St | bathroom on 3rd level of residence; remove shower & replace with shower over tub, toilet and sinks to remain in (e) locationDetails
bathroom on 3rd level of residence; remove shower & replace with shower over tub, toilet and sinks to remain in (e) location | $22,000 |
| May 12, 2022 | Completed final sign-off May 2024 | 401 Harrison St | unit 4805 48th fl: remodel of kitchen, master bath, powder rm, bathroom #1, bathroom #2 (total 3 full baths, 1 powder rm). all appliances and plumbing to remain in (e) location. removal of non-structural dividing walls in master bedroom & closet. no work outside unit 4805.Details
unit 4805 48th fl: remodel of kitchen, master bath, powder rm, bathroom #1, bathroom #2 (total 3 full baths, 1 powder rm). all appliances and plumbing to remain in (e) location. removal of non-structural dividing walls in master bedroom & closet. no work outside unit 4805. | $65,000 |
| Feb 14, 2022 | Completed final sign-off Feb 2023 | 766 10th Av | new water closet on main level. remodel (e) bathroom and water closet into one new bathroom on upper level. new kitchen remodel on main level. to comply with complaints: pid-202287335, bid-202287322, eid-202287333.Details
new water closet on main level. remodel (e) bathroom and water closet into one new bathroom on upper level. new kitchen remodel on main level. to comply with complaints: pid-202287335, bid-202287322, eid-202287333. | $60,000 |
| Jul 9, 2021 | Completed final sign-off Mar 2025 | 375 Highland Av | foundation: replace portion of e slab on grade at lower level.replace portion of e foundation walls w new. 2nd fl removed bath and kitchen,expand dining rm to enclose exterior stair,enclose lightwell not visible from public way. no windows from adjacent prop. replace portion of e roof.Details
foundation: replace portion of e slab on grade at lower level.replace portion of e foundation walls w new. 2nd fl removed bath and kitchen,expand dining rm to enclose exterior stair,enclose lightwell not visible from public way. no windows from adjacent prop. replace portion of e roof. | $310,000 |
| Aug 14, 2020 | Completed final sign-off Feb 2021 | 941 Vallejo St | bathroom remodel in-kind. (n)shower in (e) shower over tub loc. (n) tile, (n) plumbing fixtures in (e) loc. (n) vanity in (e) loc, all work to be completed in unit #51 only on 3rd floor.Details
bathroom remodel in-kind. (n)shower in (e) shower over tub loc. (n) tile, (n) plumbing fixtures in (e) loc. (n) vanity in (e) loc, all work to be completed in unit #51 only on 3rd floor. | $13,000 |
| Jul 29, 2020 | Completed final sign-off Feb 2021 | 338 Spear St | unit 4c: bathroom remodel in-kind, new shower in (e) shower over tub location, new tile, plumbing fixtures, new vanity, all work to be completed in unit 4c only.Details
unit 4c: bathroom remodel in-kind, new shower in (e) shower over tub location, new tile, plumbing fixtures, new vanity, all work to be completed in unit 4c only. | $13,000 |
| Mar 11, 2020 | Completed final sign-off Feb 2021 | 1916 Pine St | unit #1; bathroom remodel add toilet, remove shower over tub into shower stall, remodel powder room "in kind" all work to be completed in unit #1 onlyDetails
unit #1; bathroom remodel add toilet, remove shower over tub into shower stall, remodel powder room "in kind" all work to be completed in unit #1 only | $20,000 |
| Feb 19, 2020 | Completed final sign-off Feb 2021 | 101 Huntington Dr | lower level remodel to increase conditioned space of residence. (n) conditioned space includes (n) bathroom and (n) nedroom, add 2 windows to (n) bedroom & (n) bathroom.Details
lower level remodel to increase conditioned space of residence. (n) conditioned space includes (n) bathroom and (n) nedroom, add 2 windows to (n) bedroom & (n) bathroom. | $75,000 |
| Feb 13, 2020 | Completed final sign-off Dec 2020 | 1488 Harrison St | unit #305 - bathroom remodel "in-kind".Details
unit #305 - bathroom remodel "in-kind". | $13,000 |
| Feb 12, 2020 | Expired or cancelled withdrawn Feb 2020 | 101 Huntington Dr | remodel of garage level to add approx 341 sqft of (n) conditioned space. (n) conditioned space to include (n) bathroom and (n) bedroom. add (n) window in (n) bathroom; add (n) windows in (n) bedroom, in (n) bedroom an (e) egress window to remain.Details
remodel of garage level to add approx 341 sqft of (n) conditioned space. (n) conditioned space to include (n) bathroom and (n) bedroom. add (n) window in (n) bathroom; add (n) windows in (n) bedroom, in (n) bedroom an (e) egress window to remain. | $100,000 |
| Aug 19, 2019 | Completed final sign-off Dec 2019 | 1862 15th Av | master bathroom remodel and master closet addition in master bedroom envelopeDetails
master bathroom remodel and master closet addition in master bedroom envelope | $21,000 |
| Aug 19, 2019 | Completed final sign-off Dec 2019 | 2304 Vallejo St | remodel master bathroom, remove shower over tub and replace with shower in same location, all work to be completed within master bathroom envelope.Details
remodel master bathroom, remove shower over tub and replace with shower in same location, all work to be completed within master bathroom envelope. | $13,000 |
| Apr 2, 2019 | Completed final sign-off Oct 2019 | 401 Montecito Av | remodel bathroom on main floor = 64 sq ft. remove tub and replace with shower stall: add stacked washer and dryer.Details
remodel bathroom on main floor = 64 sq ft. remove tub and replace with shower stall: add stacked washer and dryer. | $13,000 |
| Mar 25, 2019 | Completed final sign-off May 2019 | 239 Brannan St | unit 14j: remodel bathroom in-kind. no strcutural work.Details
unit 14j: remodel bathroom in-kind. no strcutural work. | $13,000 |
| Feb 21, 2019 | Completed final sign-off May 2019 | 574 Waller St | remodel bathroom. remove tub and replace w/ shower stall. remodel water closet "in-kind."Details
remodel bathroom. remove tub and replace w/ shower stall. remodel water closet "in-kind." | $13,000 |
| Dec 20, 2018 | Completed final sign-off Apr 2019 | 1933 Jackson St | remodel bathroom in-kind, remodel water closet and add wall hung sink in water closetDetails
remodel bathroom in-kind, remodel water closet and add wall hung sink in water closet | $19,500 |
| Aug 31, 2018 | Completed final sign-off Oct 2018 | 53 Clarendon Av | guest bathroom remodel remove tub w/ shower. all work to be done in guest bathroom only.Details
guest bathroom remodel remove tub w/ shower. all work to be done in guest bathroom only. | $13,000 |
| May 9, 2018 | Completed final sign-off Aug 2020 | 1775 San Jose Av | remodel garage level of (e) single family residence. add new master suite, new family room and new guest bath, add qty 2 rear sliding doors not visible from street.Details
remodel garage level of (e) single family residence. add new master suite, new family room and new guest bath, add qty 2 rear sliding doors not visible from street. | $36,000 |
| May 2, 2018 | Completed final sign-off Aug 2018 | 53 Clarendon Av | bathroom remodel in-kind on 2nd fl.Details
bathroom remodel in-kind on 2nd fl. | $13,000 |
| May 1, 2018 | Completed final sign-off Aug 2018 | 817 Guerrero St | remodel guest bath on 2nd fl, remodel master bath on 3rd fl "in-kind", relocate washer and dryer to garage/1st floor and add laundry sinkDetails
remodel guest bath on 2nd fl, remodel master bath on 3rd fl "in-kind", relocate washer and dryer to garage/1st floor and add laundry sink | $26,000 |
| Mar 2, 2018 | Never finaled issued Mar 2018, no final | 643 Edna St | remodel of 1st flr to include kitchen and dining room and adding guest bathroom. remodel master bathroom on 2nd flr. reframe interior stair & garage foundation replacementDetails
remodel of 1st flr to include kitchen and dining room and adding guest bathroom. remodel master bathroom on 2nd flr. reframe interior stair & garage foundation replacement | $46,000 |
| Feb 9, 2018 | Completed final sign-off Aug 2018 | 53 Clarendon Av | remodel of master bathroom to add steam shower. all work to be done in master bathroom only. all work on 2/fDetails
remodel of master bathroom to add steam shower. all work to be done in master bathroom only. all work on 2/f | $13,000 |
| May 8, 2017 | Completed final sign-off Feb 2018 | 320 Alabama St | remodel master bath in kind on 2nd flr. replace tub with shower. remodel kitchen on 2nd flrDetails
remodel master bath in kind on 2nd flr. replace tub with shower. remodel kitchen on 2nd flr | $35,000 |
| Apr 3, 2017 | Never finaled issued Apr 2017, no final | 850 Powell St | unit 801 - bathroom remodel "in-kind" kitchen lighting & electrical work. no structural work to be doneDetails
unit 801 - bathroom remodel "in-kind" kitchen lighting & electrical work. no structural work to be done | $15,000 |
| Mar 22, 2017 | Never finaled issued Mar 2017, no final | 1673 07th Av | add office and closet at 1/f, add bathroom at 1/f, add partition walls at 1/f. partial foundation replacement.Details
add office and closet at 1/f, add bathroom at 1/f, add partition walls at 1/f. partial foundation replacement. | $16,000 |
| Jan 4, 2017 | Completed final sign-off Apr 2017 | 2299 Sacramento St | replace in kind bathroom on level threee of 5 at apartment #9' n/a maherDetails
replace in kind bathroom on level threee of 5 at apartment #9' n/a maher | $13,000 |
| Oct 19, 2016 | Completed final sign-off Jun 2017 | 1443 Alabama St | remodel kitchen, remodel laundry room, add powder bathroom. all work in home's extg envelope.Details
remodel kitchen, remodel laundry room, add powder bathroom. all work in home's extg envelope. | $32,000 |
| Oct 4, 2016 | Completed final sign-off Jan 2017 | 226 Ritch St | revision to 201606089409, add applicable ada standards for bathroom upgrades per 11aDetails
revision to 201606089409, add applicable ada standards for bathroom upgrades per 11a | |
| Sep 1, 2016 | Completed final sign-off Jan 2017 | 2299 Sacramento St | bathroom remodel in kind, remove & replace all interior fixtures & finishes. including electrical & plumbing, remove & replace window @ lightwell location of work in unit #12 level 3Details
bathroom remodel in kind, remove & replace all interior fixtures & finishes. including electrical & plumbing, remove & replace window @ lightwell location of work in unit #12 level 3 | $13,000 |
| Jun 8, 2016 | Completed final sign-off Jan 2017 | 226 Ritch St | unit 203: replace in-kind master bathroom, replace in-kind guest bathroom. compliance with maher ordinance no 155-13 not required.Details
unit 203: replace in-kind master bathroom, replace in-kind guest bathroom. compliance with maher ordinance no 155-13 not required. | $25,000 |
| May 9, 2016 | Completed final sign-off Jan 2017 | 650 Chestnut St | unit 204: remodel kitchen in kind, remove master bathroom tub, replace with shower, remodel guest bathroom in kind.Details
unit 204: remodel kitchen in kind, remove master bathroom tub, replace with shower, remodel guest bathroom in kind. | $47,000 |
| Apr 1, 2016 | Completed final sign-off Sep 2016 | 2111 Broderick St | replace bath tub with shower; replace bathroom in kindDetails
replace bath tub with shower; replace bathroom in kind | $13,000 |
| Jan 6, 2016 | Never finaled issued Jan 2016, no final | 1441 Hayes St | bathroom remodel; (n) window in-kind replace at rear of property. all work to be done at master bathroom.Details
bathroom remodel; (n) window in-kind replace at rear of property. all work to be done at master bathroom. | $13,000 |