Back to bathroom remodel contractors
3 D Design & Construction
- Based in
- San Anselmo
- On San Francisco permits
- Jul 2000 to Jun 2005
- Last 24 months
- 0 permits filed
16 permits since 2000: 16 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2005 | Completed final sign-off Feb 2006 | 1333 Jones St | unit#1603- remodel entire interior of unit #1603 including kitchen,bathroom #2,master bathroom.Details
unit#1603- remodel entire interior of unit #1603 including kitchen,bathroom #2,master bathroom. | $86,505 |
| Jun 9, 2004 | Completed final sign-off Oct 2004 | 658 29th Av | kitchen & bathroom remodel. replace cabinetry, plumbing & electrical fixtures, appliances, flooring,Details
kitchen & bathroom remodel. replace cabinetry, plumbing & electrical fixtures, appliances, flooring, | $62,000 |
| May 18, 2004 | Completed final sign-off Aug 2004 | 101 Lombard St | master bathroom remodel: replace bathtub, sinks, cabinetry, toilet and lightingDetails
master bathroom remodel: replace bathtub, sinks, cabinetry, toilet and lighting | $24,000 |