Back to bathroom remodel contractors
2k Builders Llc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2020 to Mar 2026
- Last 24 months
- 1 permit filed
15 permits since 2000: 10 completed, 1 in progress, 4 never finaled.
Of the 4 never-finaled permits, 4 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 4 completed, 3 never finaled. Typically 0 days from filing to permit and 197 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2023 | Never finaled issued Jun 2023, no final | 4032 Irving St | relocate washer and dryer to upstairs bedroom closet. convert existing level1 laundry room to half bath (toilet and lav). relocate refrigerator, kitchen cabinet and countertop alterations.Details
relocate washer and dryer to upstairs bedroom closet. convert existing level1 laundry room to half bath (toilet and lav). relocate refrigerator, kitchen cabinet and countertop alterations. | $29,000 |
| Nov 18, 2021 | Completed final sign-off Jun 2022 | 1825 Laguna St | remodel of interior kitchen, bathroom (2), floors, lighting, sheetrock, tile, new appliances, 1 bean to replace load bering wall. replace side/back windows, not visible from street. revision to 202109279194Details
remodel of interior kitchen, bathroom (2), floors, lighting, sheetrock, tile, new appliances, 1 bean to replace load bering wall. replace side/back windows, not visible from street. revision to 202109279194 | $115,000 |
| Oct 28, 2021 | Never finaled issued Oct 2021, no final | 2939 Ulloa St | 3 bathroom repair in kind due to dryrot, up to code plumbing/electrical. new tile, insulation, fixtures, vanity. no wall removal. no change of wall layout; leaks 1 sheetrock in one bedroom, repair due to leak, replace in kindDetails
3 bathroom repair in kind due to dryrot, up to code plumbing/electrical. new tile, insulation, fixtures, vanity. no wall removal. no change of wall layout; leaks 1 sheetrock in one bedroom, repair due to leak, replace in kind | $60,000 |
| Oct 8, 2021 | Never finaled issued Oct 2021, no final | 700 Illinois St | unit# 10. remodel of existing condo unit. new kitchen, bathroom, and coset area. no structural work.Details
unit# 10. remodel of existing condo unit. new kitchen, bathroom, and coset area. no structural work. | $150,000 |
| Mar 24, 2021 | Completed final sign-off Oct 2021 | 76 Saturn St | cosmetic remodel of 1 kitchen and 1 bathroom. upgrade appliances. new cabinets, countertop, vanity, toilet, tile, backsplash.Details
cosmetic remodel of 1 kitchen and 1 bathroom. upgrade appliances. new cabinets, countertop, vanity, toilet, tile, backsplash. | $20,000 |
| Feb 19, 2021 | Completed final sign-off Apr 2025 | 1812 Green St | to abate nov #200561775/enf7402 & nov #202038181/enf2020-005902 - 1/f: legalize expansion of rear deck, bath, and kitchen remodel. 2/f: restore dwelling unit & remove opening between 1/f & 2/f units. legalize change of facade entry from 2 doors to 1. basement: legalize rear expansion, laundry & bathDetails
to abate nov #200561775/enf7402 & nov #202038181/enf2020-005902 - 1/f: legalize expansion of rear deck, bath, and kitchen remodel. 2/f: restore dwelling unit & remove opening between 1/f & 2/f units. legalize change of facade entry from 2 doors to 1. basement: legalize rear expansion, laundry & bath | $20,000 |
| Oct 23, 2020 | Completed final sign-off Dec 2020 | 2205 Steiner St | unit 3: cosmetic bathroom remodelDetails
unit 3: cosmetic bathroom remodel | $15,000 |