24/7 Sf Handyman & Remodeling Service
- Based in
- San Francisco
- On San Francisco permits
- Feb 2025 to Feb 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2025 | Completed final sign-off Feb 2026 | 1546 Guerrero St | legalization of existing, non electric, plastic laminated sheet metal wall sign, 4 feet by 9.5 feet fastened directly to adjacent wall with non-corrosive concrete screws.Details
legalization of existing, non electric, plastic laminated sheet metal wall sign, 4 feet by 9.5 feet fastened directly to adjacent wall with non-corrosive concrete screws. | $300 |
| Feb 26, 2025 | Completed final sign-off Feb 2026 | 1546 Guerrero St | legalization of existing, non electric, 1/4" thick, plastic laminated sheet metal, wall-mounted sign about 3.5 feet x 11.5 feet.Details
legalization of existing, non electric, 1/4" thick, plastic laminated sheet metal, wall-mounted sign about 3.5 feet x 11.5 feet. | $300 |