Back to bathroom remodel contractors
16-91 Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Nov 2022
- Last 24 months
- 0 permits filed
25 permits since 2000: 18 completed, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 5 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2010 | Completed final sign-off Mar 2011 | 1262 29th Av | legalize rooms and full bathroom at ground floor. remodel two bathrooms on 3rd floor, no wall relocation. voluntary reinforce (e)foundation.Details
legalize rooms and full bathroom at ground floor. remodel two bathrooms on 3rd floor, no wall relocation. voluntary reinforce (e)foundation. | $40,000 |
| Apr 21, 2010 | Completed final sign-off Aug 2010 | 1731 30th Av | replace floor tile at bathroom, replace tile t tub surround . area 5'-6"x8'. reinstall existing tub. no change of electrical.Details
replace floor tile at bathroom, replace tile t tub surround . area 5'-6"x8'. reinstall existing tub. no change of electrical. | $4,004 |