Back to bathroom remodel contractors
13-D Fire Systems
- Based in
- Novato
- On San Francisco permits
- Feb 2000 to Oct 2018
- Last 24 months
- 0 permits filed
239 permits since 2000: 140 completed, 56 never finaled, 43 expired or cancelled.
Of the 56 never-finaled permits, 11 are 5 to 10 years old, 45 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 20 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 6, 2007 | Completed final sign-off Jul 2007 | 2136 Palou Av | alterations to (e) nfpa 13 fire sprinklers system for remodel of hallway - bathroom area. 7 deleted / removed heads. 8 relocated heads.Details
alterations to (e) nfpa 13 fire sprinklers system for remodel of hallway - bathroom area. 7 deleted / removed heads. 8 relocated heads. | $5,000 |
| Apr 21, 2004 | Completed final sign-off Jan 2005 | 149 02nd St | as builts showing relocation of bathrooms etc. & new drop ceiling. sprinkler pipes relocated & headsDetails
as builts showing relocation of bathrooms etc. & new drop ceiling. sprinkler pipes relocated & heads | $17,000 |