Block 6916, lot 023
80 Estero Ave
- City’s use
- Single Family Residential
- Built
- 1925
- Stories
- 1
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 1,864 sq ft
- Lot
- 13,111 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 29, 2023 | Completed final sign-off Feb 2024 | 80 Estero Av | Beyond The Horizon Construction | remodel kitchen in kind. no change to structure or walls.Details
remodel kitchen in kind. no change to structure or walls. | $10,000 |
| Feb 2, 2021 | Completed final sign-off May 2022 | 80 Estero Av | backyard gazebo on reinforced concrete slab. hexagonal shape. d.i.y. kit. aluminum frame. high impact clear poly-carbonate walls & roof. electrical lighting & receptacles. ref 2020-010590var.Details
backyard gazebo on reinforced concrete slab. hexagonal shape. d.i.y. kit. aluminum frame. high impact clear poly-carbonate walls & roof. electrical lighting & receptacles. ref 2020-010590var. | $18,000 | |
| Feb 27, 2018 | Completed final sign-off Mar 2018 | 80 Estero Av | replace four existing wood double hung windows in-kind same openings at rear and side complete with ogee lugs. no other work. back of house. max u-factor 0.32Details
replace four existing wood double hung windows in-kind same openings at rear and side complete with ogee lugs. no other work. back of house. max u-factor 0.32 | $3,700 | |
| Jan 31, 2018 | Completed final sign-off Mar 2018 | 80 Estero Av | basement anchor bolts, shear structural plywood on about 11 linear feet of basement stud walls. add 5/8" x 10" wedge anchor bolsts min. 16" oc as needed place kraft paper faced r-19 fiberglass insulation in stud cavities. cover with 5/8" type x gypsum board. voluntary strenthening.Details
basement anchor bolts, shear structural plywood on about 11 linear feet of basement stud walls. add 5/8" x 10" wedge anchor bolsts min. 16" oc as needed place kraft paper faced r-19 fiberglass insulation in stud cavities. cover with 5/8" type x gypsum board. voluntary strenthening. | $1,500 | |
| Dec 27, 2016 | Completed final sign-off Dec 2017 | 80 Estero Av | to obtain final inspection for work approved under pa# 201408274891 & 201506249853. all work is complete.Details
to obtain final inspection for work approved under pa# 201408274891 & 201506249853. all work is complete. | ||
| Jun 24, 2015 | Expired or cancelled expired Dec 2016 | 80 Estero Av | revision to app#201408274891. change to ground floor plan to provide 18" cantileavered bay on 2nd floor to match other bay windows of home. also modified footer detail.Details
revision to app#201408274891. change to ground floor plan to provide 18" cantileavered bay on 2nd floor to match other bay windows of home. also modified footer detail. | ||
| Aug 27, 2014 | Expired or cancelled expired Dec 2016 | 80 Estero Av | horizontal addition. add bathroom & modify closet upstairs. demo (e) stair case. bathroom will extend into side yard as bay, also creating a small, unconditioned storage room in basement.(this is a building addition)Details
horizontal addition. add bathroom & modify closet upstairs. demo (e) stair case. bathroom will extend into side yard as bay, also creating a small, unconditioned storage room in basement.(this is a building addition) | $20,000 | |
| May 16, 2008 | Completed final sign-off May 2008 | 80 Estero Av | renew for final inspection of 200608189880.Details
renew for final inspection of 200608189880. | ||
| Oct 26, 2007 | Expired or cancelled expired Feb 2008 | 80 Estero Av | renew pa#200608189880 for final inspection.Details
renew pa#200608189880 for final inspection. | ||
| Aug 18, 2006 | Expired or cancelled expired Oct 2007 | 80 Estero Av | kitchen remodel, including plumbing & electrical. ceiling repairs. wall repairs. (add r-13 fg to extr walls), recover. relocate / door. cover / door. new cook top exhaust fan through (e) roof opening. all lighting fluorescent as practicable minimum more than 50%0Details
kitchen remodel, including plumbing & electrical. ceiling repairs. wall repairs. (add r-13 fg to extr walls), recover. relocate / door. cover / door. new cook top exhaust fan through (e) roof opening. all lighting fluorescent as practicable minimum more than 50%0 | $25,000 | |
| Sep 26, 2003 | Completed final sign-off Oct 2003 | 80 Estero Av | renew app #200301316387/200102021227Details
renew app #200301316387/200102021227 | ||
| Jan 31, 2003 | Expired or cancelled expired Oct 2003 | 80 Estero Av | renew pa#2001/02/02/1227 for final inspectionDetails
renew pa#2001/02/02/1227 for final inspection | ||
| Jun 24, 2002 | Completed final sign-off Oct 2002 | 80 Estero Av | Gonzalez Roofing & Water | reroofingDetails
reroofing | $11,958 |
| Feb 2, 2001 | Expired or cancelled expired Jun 2001 | 80 Estero Av | finish unfinished basement rm-convert to bedrm, modify (e) bedrm adjacent to unfinished rmDetails
finish unfinished basement rm-convert to bedrm, modify (e) bedrm adjacent to unfinished rm | $4,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Beyond The Horizon Construction, Gonzalez Roofing & Water
- Engineers
- Blair Horst (2), Dr. Amin Ghafooripour
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.