Block 6797, lot 014
54 Francis St
- City’s use
- Multi-Family Residential
- Built
- 1917
- Stories
- 3
- Units
- 3
- Rooms
- 5 bedrooms, 7 bathrooms
- Building
- 3,320 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 4, 2019 | Completed final sign-off Nov 2019 | 54 Francis St | Sure Roofing Systems/R.O.Choy | reroofing.Details
reroofing. | $18,000 |
| Jan 24, 2018 | Never finaled issued Jan 2018, no final | 54 Francis St | Sure Roofing Systems/R.O.Choy | remove (e) main flat roof layers down to expose wood sheething install modified bitumen membrane system by torch down.Details
remove (e) main flat roof layers down to expose wood sheething install modified bitumen membrane system by torch down. | $17,000 |
| Aug 28, 2017 | Completed final sign-off Nov 2017 | 56 Francis St | H & L Construction Inc | revision to pa 2016-1121-3175 - remove additional kitchen from scope. convert proposed living room to bedroom on 1st floor. add staircase inside. remodel kitchen on 2nd lfoor. all other work from 2016-1121-3175 to remain the sameDetails
revision to pa 2016-1121-3175 - remove additional kitchen from scope. convert proposed living room to bedroom on 1st floor. add staircase inside. remodel kitchen on 2nd lfoor. all other work from 2016-1121-3175 to remain the same | $10,000 |
| Jun 27, 2017 | Expired or cancelled cancelled Aug 2023 | 54 Francis St | ground fl: installation of new fire sprinkler system (nfpa-13) and underground (nfpa-24) for added (third) unit. 10 heads. ref 2016-1121-3175Details
ground fl: installation of new fire sprinkler system (nfpa-13) and underground (nfpa-24) for added (third) unit. 10 heads. ref 2016-1121-3175 | $5,800 | |
| Jun 26, 2017 | Expired or cancelled cancelled Sep 2017 | 56 Francis St | H & L Construction Inc | revision to 201611213175 - reconfigure floor layout for new unit. relocate kitchen to rear, shift bathroom locations, enlarge home officeDetails
revision to 201611213175 - reconfigure floor layout for new unit. relocate kitchen to rear, shift bathroom locations, enlarge home office | $100 |
| May 3, 2017 | Completed final sign-off Nov 2017 | 54 Francis St | H & L Construction Inc | revision to 201701177233: 2nd & 3rd flr reconfigure bathroom layout including fixtures and walls; and new closet and new skylight @ (e) kitchen - flat roofDetails
revision to 201701177233: 2nd & 3rd flr reconfigure bathroom layout including fixtures and walls; and new closet and new skylight @ (e) kitchen - flat roof | $1,000 |
| Jan 17, 2017 | Completed final sign-off Nov 2017 | 54 Francis St | H & L Construction Inc | at 2nd fl unit, remodel (e) bath, 2 new baths, new laundy. 3rd fl unit remodel e bath, 1 new full bath, new 1/2 bath and new laundry, infill e lightwell and relocate 1 water heater to 3rd fl.Details
at 2nd fl unit, remodel (e) bath, 2 new baths, new laundy. 3rd fl unit remodel e bath, 1 new full bath, new 1/2 bath and new laundry, infill e lightwell and relocate 1 water heater to 3rd fl. | $50,000 |
| Nov 21, 2016 | Completed final sign-off Nov 2017 | 56 Francis St | H & L Construction Inc | convert a 2-family dwelling into a 3-family dwelling. add 1 accessory dwelling unit (adu) per ord 162-16 planning code section 207 (c)(4) and 307(1). new adu located at 1st floor adj to (e) garage.Details
convert a 2-family dwelling into a 3-family dwelling. add 1 accessory dwelling unit (adu) per ord 162-16 planning code section 207 (c)(4) and 307(1). new adu located at 1st floor adj to (e) garage. | $20,000 |
| Oct 2, 2000 | Completed final sign-off Oct 2000 | 56 Francis St | termite workdamage to structure framing and sill sections and sidingDetails
termite workdamage to structure framing and sill sections and siding | $3,922 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- H & L Construction Inc (5), Sure Roofing Systems/R.O.Choy (2)
- Architects
- Bill Xie Guan (3)
- Engineers
- Bill Xie Guan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.