Block 6742, lot 011
683 Chenery St
- City’s use
- Commercial Retail
- Built
- 1929
- Stories
- 1
- Rooms
- 2 bathrooms
- Building
- 2,070 sq ft
- Lot
- 1,724 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 10, 2025 | Completed final sign-off Apr 2026 | 683 Chenery St | Ibuild Design And Construction Inc | deferred electrical submittal for bpa# 202508072517Details
deferred electrical submittal for bpa# 202508072517 | $59,508 |
| Aug 7, 2025 | Completed final sign-off Apr 2026 | 683 Chenery St | Ibuild Design And Construction Inc | improve an (e) building & construct interior improvement @ the premises for future new tenant. (music school). window replacement ar rear (3) from (e) vinyl to (n) wood.Details
improve an (e) building & construct interior improvement @ the premises for future new tenant. (music school). window replacement ar rear (3) from (e) vinyl to (n) wood. | $87,520 |
| Jul 31, 2025 | Expired or cancelled cancelled May 2026 | 683 Chenery St | Berkeley Signs | single faced, non eletric, wall sign "crescendo" the sign will be screwed in thru the front of the sign thru the wood substrate w/ multiple screws. 1' x 8', 3" thick, 10 lbsDetails
single faced, non eletric, wall sign "crescendo" the sign will be screwed in thru the front of the sign thru the wood substrate w/ multiple screws. 1' x 8', 3" thick, 10 lbs | $10,000 |
| Jun 18, 2025 | Completed final sign-off Apr 2026 | 683 Chenery St | Ibuild Design And Construction Inc | per ab-17, selective interior demolition, capping and removing electrical conduits, plumbing drain and water piping, remove & cap hvac distribution duct. remove platform and part of ceiling. non-structural demo.Details
per ab-17, selective interior demolition, capping and removing electrical conduits, plumbing drain and water piping, remove & cap hvac distribution duct. remove platform and part of ceiling. non-structural demo. | $17,000 |
| Feb 15, 2018 | Expired or cancelled cancelled May 2023 | 683 Chenery St | (e) ground fl restaurant facing chenery st. will be redeveloped as a new restaurant with a new kitchn & support spaces / kitchen & restaurant interior will be a separate t.i. permit. (e) 3 story rear bldg on wilder st. will be replaced with 4 new residential apts. 2 studios, 2-1 br units in a newDetails
(e) ground fl restaurant facing chenery st. will be redeveloped as a new restaurant with a new kitchn & support spaces / kitchen & restaurant interior will be a separate t.i. permit. (e) 3 story rear bldg on wilder st. will be replaced with 4 new residential apts. 2 studios, 2-1 br units in a new | $950,000 | |
| Jun 20, 2005 | Completed final sign-off Sep 2005 | 683 Chenery St | S J Gogol Construction | pest control report #8187-05 remove & repair buckled & loosely bonded stucco @rear wall of structureDetails
pest control report #8187-05 remove & repair buckled & loosely bonded stucco @rear wall of structure | $7,650 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ibuild Design And Construction Inc (3), Berkeley Signs, S J Gogol Construction
- Architects
- Stepan Berlov (2), Carl Scheidenhelm
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.