Block 6656, lot 022
130 Randall St
- City’s use
- Single Family Residential
- Built
- 1954
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 1 bathroom
- Building
- 837 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 28, 2016 | Never finaled issued Apr 2016, no final | 130 Randall St | street space permit pa # 201404113060Details
street space permit pa # 201404113060 | ||
| Apr 8, 2016 | Completed final sign-off Oct 2016 | 130 Randall St | Build Rest Construction Inc. | revision to pa#201603111859 for fire sprinkler system only. to show domestic fire service to lead free backflow assembly.Details
revision to pa#201603111859 for fire sprinkler system only. to show domestic fire service to lead free backflow assembly. | |
| Mar 11, 2016 | Completed final sign-off Oct 2016 | 130 Randall St | Build Rest Construction Inc. | new fire sprinkler system throughout entire building as per approved architectural plans and new underground fire service new (35) sprinklers ref # 201404113060 s1-r1.Details
new fire sprinkler system throughout entire building as per approved architectural plans and new underground fire service new (35) sprinklers ref # 201404113060 s1-r1. | $20,000 |
| Apr 11, 2014 | Completed final sign-off Sep 2016 | 130 Randall St | Cardea Bldg Dba Dimension Design Group | remove (e) 160 sf. rear wing @ 2/f. add (n) rear wing & 3/f. new windows & doors throughout. 1 new skylight. fire separation of garage from conditioned spaces. new communication stair between 1st to 3rd levels. new gas fired furnace & water heater with distribution as req.Details
remove (e) 160 sf. rear wing @ 2/f. add (n) rear wing & 3/f. new windows & doors throughout. 1 new skylight. fire separation of garage from conditioned spaces. new communication stair between 1st to 3rd levels. new gas fired furnace & water heater with distribution as req. | $410,000 |
| Nov 28, 2007 | Completed final sign-off Mar 2008 | 130 Randall St | Amermex Upgrade | remodel (e) bathroom including new tile, plumbing fixtures, install exhaust fan & update lighting fixtures. replace furnishings including lav, toilet & tub at 2nd floor.Details
remodel (e) bathroom including new tile, plumbing fixtures, install exhaust fan & update lighting fixtures. replace furnishings including lav, toilet & tub at 2nd floor. | $16,000 |
| Jun 22, 2006 | Expired or cancelled expired Jun 2007 | 130 Randall St | Home Works Inc/Kitchen Work Inc | replace 6 windows, size for size. aluminum to wood composite. visible from street. u-valve 0.39Details
replace 6 windows, size for size. aluminum to wood composite. visible from street. u-valve 0.39 | $9,000 |
| Feb 7, 2006 | Expired or cancelled cancelled Nov 2007 | 130 Randall St | remove (e) 16.0 s.f. rear extension at 1st floor, remove (e) 162.0 s.f. extension at rear of 2nd floor.Details
remove (e) 16.0 s.f. rear extension at 1st floor, remove (e) 162.0 s.f. extension at rear of 2nd floor. | $200,000 | |
| Sep 2, 2003 | Completed final sign-off Nov 2003 | 130 Randall St | Lynagh Construction | replace kitchen cabinets/sink, new elec trim & meet code. replace wrong address on appl#200308222845Details
replace kitchen cabinets/sink, new elec trim & meet code. replace wrong address on appl#200308222845 | $10,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.