Block 6582, lot 031
4205 Cesar Chavez St
- City’s use
- Multi-Family Residential
- Built
- 1974
- Stories
- 2
- Units
- 4
- Rooms
- 8 bedrooms, 5 bathrooms
- Building
- 3,600 sq ft
- Lot
- 2,848 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 5, 2014 | Completed final sign-off Oct 2015 | 4205 Cesar Chavez St | Todd Felix Costanza | unit #2 & #4 only. cosmetic remodel of 2 kitchens and 2 bathrooms. remove wall section and install header between kitchen and dining room. install washer/dryer hook ups in kitchen. replace extg water heater. replace extg rear facing windows in kind (7). install wood flooring.Details
unit #2 & #4 only. cosmetic remodel of 2 kitchens and 2 bathrooms. remove wall section and install header between kitchen and dining room. install washer/dryer hook ups in kitchen. replace extg water heater. replace extg rear facing windows in kind (7). install wood flooring. | $80,000 |
| Apr 1, 2014 | Completed final sign-off Jul 2014 | 4205 Cesar Chavez St | Todd Felix Costanza | work in units 1 at 2nd fl and 3 on 3rd fl. remove wall section and install header between kitchen and living roomDetails
work in units 1 at 2nd fl and 3 on 3rd fl. remove wall section and install header between kitchen and living room | $4,000 |
| Feb 11, 2014 | Completed final sign-off Jul 2014 | 4205 Cesar Chavez St | Todd Felix Costanza | units 1&3: kitchens 130 sf each/baths 50 sf each, cosmetic remodel (no structural) to 2 kitchens and 3 bathrms, install new wood floors throughout. install shower pan replace existing windows (in kind) trhoughout (9)Details
units 1&3: kitchens 130 sf each/baths 50 sf each, cosmetic remodel (no structural) to 2 kitchens and 3 bathrms, install new wood floors throughout. install shower pan replace existing windows (in kind) trhoughout (9) | $90,000 |
| Oct 21, 2013 | Completed final sign-off Nov 2013 | 4205 Cesar Chavez St | Tom Lee Roofing Inc. | re-roofingDetails
re-roofing | $19,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Todd Felix Costanza (3), Tom Lee Roofing Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.