Block 6580, lot 031B
4061 Cesar Chavez St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 5, 2019 | Completed final sign-off Jun 2019 | 4061 Cesar Chavez St | San Francisco Fire Protection | sprinkler monitoring fire alrm installation. install facp smoke det manual pull, aes radio and monitoring modules on waterflow tamper switche and aes radioDetails
sprinkler monitoring fire alrm installation. install facp smoke det manual pull, aes radio and monitoring modules on waterflow tamper switche and aes radio | $5,000 |
| Feb 7, 2019 | Never finaled issued Feb 2019, no final | 4061 Cesar Chavez St | street spaceDetails
street space | ||
| Dec 12, 2018 | Never finaled issued Dec 2018, no final | 4061 Cesar Chavez St | Pro Plumbing & Fire Sprinkler Inc | fire sprinkler system as built including hydraulic calculatoins ref 201809251269Details
fire sprinkler system as built including hydraulic calculatoins ref 201809251269 | |
| Sep 25, 2018 | Completed final sign-off Jun 2019 | 4061 Cesar Chavez St | Pro Plumbing & Fire Sprinkler Inc | install new fire sprinkler system through-out building per nfpa 13r including dedicated 2" fire service off of 8-inch main on cesar chavez (total sprinklers 54)Details
install new fire sprinkler system through-out building per nfpa 13r including dedicated 2" fire service off of 8-inch main on cesar chavez (total sprinklers 54) | $28,350 |
| Aug 3, 2018 | Completed final sign-off Aug 2019 | 4061 Cesar Chavez St | Martin Tynan & Son Construction | revision to 201611082235, replace simpson steel frames with plywood shearwalls, update foundation details per as-built conditions along east side, sectionsal pour on west side, add new elevatorDetails
revision to 201611082235, replace simpson steel frames with plywood shearwalls, update foundation details per as-built conditions along east side, sectionsal pour on west side, add new elevator | |
| Jul 5, 2018 | Never finaled issued Jul 2018, no final | 4061 Cesar Chavez St | street spaceDetails
street space | ||
| Jun 21, 2018 | Completed final sign-off Jun 2018 | 4061 Cesar Chavez St | Martin Tynan & Son Construction | for administrative purposes to verify building use as (1) dwelling unit per city records (assessor's, water department & dbi site visit).Details
for administrative purposes to verify building use as (1) dwelling unit per city records (assessor's, water department & dbi site visit). | |
| Nov 8, 2016 | Completed final sign-off Aug 2019 | 4061 Cesar Chavez St | renovate (e) single family 2-story home to 2-unit, 4-story building w/ vertical & horizontal addition.Details
renovate (e) single family 2-story home to 2-unit, 4-story building w/ vertical & horizontal addition. | $450,000 | |
| Oct 11, 2012 | Completed final sign-off Dec 2012 | 4061 Cesar Chavez St | Jjj & K Inc./Dba: Alexander Company | replace 5 windows size for size not visible from the street with simonton vinyl windows "u" value less than .40Details
replace 5 windows size for size not visible from the street with simonton vinyl windows "u" value less than .40 | $5,303 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Martin Tynan & Son Construction (2), Pro Plumbing & Fire Sprinkler Inc (2), Jjj & K Inc./Dba: Alexander Company, San Francisco Fire Protection
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.