Block 6551, lot 031
65 Clipper St
- City’s use
- Single Family Residential
- Built
- 1912
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 4 bathrooms
- Building
- 1,657 sq ft
- Lot
- 2,964 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2025 | In progress issued Dec 2025 | 65 Clipper St | Amplified Electric Llc | solar permit: installing 9 solar pv modules, 405 watts per module, total no. of rating 3.645 kw. mounted: roof, ballasted: n | install (9) 405w pv panels install (9) iq8+ microinverters install (n) 100a main service panelDetails
solar permit: installing 9 solar pv modules, 405 watts per module, total no. of rating 3.645 kw. mounted: roof, ballasted: n | install (9) 405w pv panels install (9) iq8+ microinverters install (n) 100a main service panel | |
| Oct 27, 2025 | In progress filed Oct 2025, not yet issued | 65 Clipper St | High Definition Solar Inc (Dba) High Def | solar permit: installing 15 solar pv modules, 405 watts per module, total no. of rating 6.075 kw. mounted: roof, ballasted: n | install (15) 405w pv panels install (15) iq8+ microinverters install (1) 100a main service panelDetails
solar permit: installing 15 solar pv modules, 405 watts per module, total no. of rating 6.075 kw. mounted: roof, ballasted: n | install (15) 405w pv panels install (15) iq8+ microinverters install (1) 100a main service panel | $35,000 |
| Aug 15, 2017 | Completed final sign-off Sep 2017 | 65 Clipper St | Ventana 76 | install an ortal factory gas fireplace in an existing lower floor wall as per manufacter's insturctions.Details
install an ortal factory gas fireplace in an existing lower floor wall as per manufacter's insturctions. | $20,000 |
| May 18, 2004 | Never finaled issued May 2004, no final | 65 Clipper St | Anderson Roofing & Sheet Metal | reroofingDetails
reroofing | $20,970 |
| Jan 17, 2002 | Completed final sign-off Jan 2002 | 65 Clipper St | Ventana 76 | horizontal (deck) additionDetails
horizontal (deck) addition | |
| May 24, 2001 | Completed final sign-off Feb 2002 | 65 Clipper St | Ventana 76 | revision to 200007266226: lower bath & upper deck will not be done at this time.Details
revision to 200007266226: lower bath & upper deck will not be done at this time. | |
| Jul 26, 2000 | Completed final sign-off Feb 2002 | 65 Clipper St | Ventana 76 | family room addition at rear breakfast rm 2nd floor room remodelDetails
family room addition at rear breakfast rm 2nd floor room remodel | $60,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ventana 76 (4), Amplified Electric Llc, Anderson Roofing & Sheet Metal, High Definition Solar Inc (Dba) High Def
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.