Block 6206, lot 012
109 Campbell Ave
- City’s use
- Single Family Residential
- Built
- 1947
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,683 sq ft
- Lot
- 1,190 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 1, 2026 | Completed final sign-off Jun 2026 | 109 Campbell Av | Mr. Roofing, Inc. | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $22,000 |
| Apr 19, 2018 | Completed final sign-off Feb 2019 | 109 Campbell Av | Jemico Llc Dba Renewal By Andersen Of Sf | replace 4 windows. 2 at front (from aluminum slider to wood clad casement) at 2nd floor; 2 at rear (from aluminum to fibrex). no other work proposed.Details
replace 4 windows. 2 at front (from aluminum slider to wood clad casement) at 2nd floor; 2 at rear (from aluminum to fibrex). no other work proposed. | $11,915 |
| Jun 16, 2009 | Never finaled issued Jun 2009, no final | 109 Campbell Av | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| Apr 28, 2009 | Completed final sign-off Jul 2009 | 109 Campbell Av | remove (e) rear steps and replace with new steps & deck (redwood) at rear. reference pa #200710196014.Details
remove (e) rear steps and replace with new steps & deck (redwood) at rear. reference pa #200710196014. | $3,000 | |
| Dec 18, 2008 | Completed final sign-off Jun 2009 | 109 Campbell Av | S & A Construction/Shaun & Ashlee Const. | remodel 1 bathroom on 2nd floor upgrade electrical & plumbing replace sheetrock.Details
remodel 1 bathroom on 2nd floor upgrade electrical & plumbing replace sheetrock. | $5,000 |
| Oct 19, 2007 | Completed final sign-off Jul 2009 | 109 Campbell Av | S & A Construction/Shaun & Ashlee Const. | to comply w/ nov 200717407, legalize lower floorbedroom,bathroom,laundry room,and new 1/2 bath at main floor. new window at rear.Details
to comply w/ nov 200717407, legalize lower floorbedroom,bathroom,laundry room,and new 1/2 bath at main floor. new window at rear. | $28,000 |
| Sep 6, 2007 | Expired or cancelled cancelled Aug 2022 | 109 Campbell Av | bathroom remodel in kind, toilet & tub to stay, retile glass on 2nd floorDetails
bathroom remodel in kind, toilet & tub to stay, retile glass on 2nd floor | $5,000 | |
| Jun 27, 2005 | Completed final sign-off Jul 2005 | 109 Campbell Av | 21st Century Home Improvt | install vinyl siding to right side of house.no structural changes.not visible from streetDetails
install vinyl siding to right side of house.no structural changes.not visible from street | $3,000 |
| Oct 7, 2004 | Completed final sign-off Apr 2005 | 109 Campbell Av | American Roofing | reroofingDetails
reroofing | $7,200 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- S & A Construction/Shaun & Ashlee Const. (2), 21st Century Home Improvt, American Roofing, Jemico Llc Dba Renewal By Andersen Of Sf, Mr. Roofing, Inc.
- Architects
- Maxwell Beaumont
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.