Block 6023, lot 040
294 Munich St
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 2
- Units
- 2
- Rooms
- 5 bedrooms, 4 bathrooms
- Building
- 3,000 sq ft
- Lot
- 2,513 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2025 | In progress issued Jun 2026 | 294 Munich St | add 2 adus per local adu program. convert garage to living unit. convert commerical space to living unit. separate permit for sprinkler. deferred submittal for the required ab-094 work and this permit requires the completion of that ab-094 permitDetails
add 2 adus per local adu program. convert garage to living unit. convert commerical space to living unit. separate permit for sprinkler. deferred submittal for the required ab-094 work and this permit requires the completion of that ab-094 permit | $100,000 | |
| Jul 15, 2019 | Completed final sign-off Jul 2020 | 298 Munich St | commencement of work not started under previously approved pemrit application pa 201508285516Details
commencement of work not started under previously approved pemrit application pa 201508285516 | ||
| Jun 25, 2019 | Completed final sign-off Jan 2020 | 298 Munich St | get permit for old awning that was never permited on the building legalize (e) awningDetails
get permit for old awning that was never permited on the building legalize (e) awning | $5,000 | |
| Sep 17, 2018 | Completed final sign-off Oct 2020 | 929 Brazil Av | Kitami | rev. to 201612306302 to document h2o heater, boiler, washer, dryer location. install water heater/boiler,washer/dryer. create new hallway. construct details of wall 2"x4"- 16" o.c. 5/8" type x bothsides 1 hr wall disabled access compliance at front entry of commercial space. new ada restroom.Details
rev. to 201612306302 to document h2o heater, boiler, washer, dryer location. install water heater/boiler,washer/dryer. create new hallway. construct details of wall 2"x4"- 16" o.c. 5/8" type x bothsides 1 hr wall disabled access compliance at front entry of commercial space. new ada restroom. | |
| Feb 6, 2017 | Never finaled issued Feb 2017, no final | 298 Munich St | street space & sidewalkDetails
street space & sidewalk | ||
| Dec 30, 2016 | Completed final sign-off Oct 2020 | 929 Brazil Av | Kitami | legalize unit behind commercial space per ord #43-14Details
legalize unit behind commercial space per ord #43-14 | $23,000 |
| Aug 28, 2015 | Expired or cancelled expired Jul 2020 | 298 Munich St | repair (e) roof deck & rails, less than 50% in-kind.Details
repair (e) roof deck & rails, less than 50% in-kind. | $3,000 | |
| Jul 3, 2015 | Expired or cancelled cancelled Jan 2026 | 294 Munich St | adding 2 standing showers for the 2 rooms as shown in the drawing.Details
adding 2 standing showers for the 2 rooms as shown in the drawing. | $10,000 | |
| May 6, 2015 | Expired or cancelled withdrawn Jun 2019 | 294 Munich St | 1)develope ground floor rooms. in back of the commercial space make 2 new rooms and reduce the size of the commercial and add bathrooms. 2) to make the 2 garage out of 3 another rooms with bath(to comply with nov #201542731)Details
1)develope ground floor rooms. in back of the commercial space make 2 new rooms and reduce the size of the commercial and add bathrooms. 2) to make the 2 garage out of 3 another rooms with bath(to comply with nov #201542731) | $20,000 | |
| Mar 13, 2015 | Completed final sign-off Apr 2015 | 294 Munich St | installing washer & dryer inside kitchen area.Details
installing washer & dryer inside kitchen area. | $500 | |
| Sep 15, 2014 | Completed final sign-off Sep 2014 | 298 Munich St | window replacement with wooden double hung windows with ogees.Details
window replacement with wooden double hung windows with ogees. | $2,000 | |
| Sep 15, 2014 | Never finaled issued Sep 2014, no final | 298 Munich St | revision to app#201403130621. change location of the bathroom about 7'-0" inside the room.Details
revision to app#201403130621. change location of the bathroom about 7'-0" inside the room. | ||
| Mar 13, 2014 | Never finaled issued Mar 2014, no final | 298 Munich St | Kitami | adding bathroom to the store at first floor.Details
adding bathroom to the store at first floor. | $11,000 |
| Feb 11, 2014 | Never finaled issued Feb 2014, no final | 298 Munich St | to make the space in the back one room and make 1/2 bath room and close 2 small walls. comply with nov # 201341251Details
to make the space in the back one room and make 1/2 bath room and close 2 small walls. comply with nov # 201341251 | $4,000 | |
| Nov 5, 2013 | Completed final sign-off Feb 2014 | 294 Munich St | a bathroom is to be added to one of the rooms upstairs.Details
a bathroom is to be added to one of the rooms upstairs. | $3,000 | |
| Mar 17, 2008 | Completed final sign-off Jul 2019 | 298 Munich St | Hai's Roofing Company | reroofingDetails
reroofing | $6,000 |
| Mar 25, 2002 | Completed final sign-off May 2002 | 298 Munich St | H K Fire Protection Inc.* Check I.D. *** | install a fire suppression system to the kitchen hood use range guard 2 1/2 gallon system 1/fDetails
install a fire suppression system to the kitchen hood use range guard 2 1/2 gallon system 1/f | $900 |
| Jan 17, 2002 | Completed final sign-off May 2002 | 298 Munich St | Kohler | install type one hood, duct,makeup air, exhaust fan & makeup air fanDetails
install type one hood, duct,makeup air, exhaust fan & makeup air fan | $7,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.