Block 5918, lot 032
600 Silliman St
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 2
- Units
- 2
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,534 sq ft
- Lot
- 4,050 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 27, 2026 | Completed final sign-off Apr 2026 | 600 Silliman St | for documentation purpose the legal use of the bldg is two residential dwelling units. this determination is based on the review of city records. no work to be performed.Details
for documentation purpose the legal use of the bldg is two residential dwelling units. this determination is based on the review of city records. no work to be performed. | ||
| Feb 15, 2018 | Completed final sign-off Apr 2018 | 600 Silliman St | remove & replace damaged portions of wood with pressure treated wood. garage wing walls and front room wall. approx. 100sf..Details
remove & replace damaged portions of wood with pressure treated wood. garage wing walls and front room wall. approx. 100sf.. | $6,500 | |
| Oct 5, 2012 | Never finaled issued Oct 2012, no final | 600 Silliman St | Integrity Roofing Systems | reroofingDetails
reroofing | $15,800 |
| Oct 2, 2012 | Completed final sign-off Mar 2013 | 600 Silliman St | replace all exterior windows. 12 windows face street, 6 windows on back side. all windows to be milgard wood clad windows. no sliders.Details
replace all exterior windows. 12 windows face street, 6 windows on back side. all windows to be milgard wood clad windows. no sliders. | $9,200 | |
| Oct 2, 2012 | Completed final sign-off Mar 2013 | 600 Silliman St | 2 new garage doors.Details
2 new garage doors. | $3,500 | |
| Sep 27, 2012 | Completed final sign-off Mar 2013 | 600 Silliman St | remodel at both units. kitchen and bath remodels. new electrical, plumbing, cabinets, reroute gas line. new furnace, new vent upstairs bath. new hood to existing vent at kitchen. new light fixtures to be high efficacy. painting, drywallDetails
remodel at both units. kitchen and bath remodels. new electrical, plumbing, cabinets, reroute gas line. new furnace, new vent upstairs bath. new hood to existing vent at kitchen. new light fixtures to be high efficacy. painting, drywall | $28,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Integrity Roofing Systems
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.