Block 5718, lot 042
130 Highland Ave
- City’s use
- Single Family Residential
- Built
- 1910
- Stories
- 2
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,275 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 8, 2024 | In progress issued Jul 2024 | 130 Highland Av | Sutro Power | revision with correction scope under permit# 202308013477 to"installation of roof mounted pv system includes :(16)dna-120- bf10-440w pv modules; (16) s440 solaredge optimizers connected to (1) solaredge se7600h-ussnbbl14 inverter msp main derate - bus:125 new main: 100; (n) dc system...Details
revision with correction scope under permit# 202308013477 to"installation of roof mounted pv system includes :(16)dna-120- bf10-440w pv modules; (16) s440 solaredge optimizers connected to (1) solaredge se7600h-ussnbbl14 inverter msp main derate - bus:125 new main: 100; (n) dc system... | $56,345 |
| Aug 1, 2023 | In progress issued Jan 2024 | 130 Highland Av | Solcius Llc | installation of roof mounted pv system includes - (14) dna-120bf 10-440w pv modules. (1) solaredge se7600h-ussnbbl 14 inverter. msp main derate - bus: 125 new main: 100. (n) dc system size: 6.16 kw-dc. (n) ac system size: 7.6 kw-ac.Details
installation of roof mounted pv system includes - (14) dna-120bf 10-440w pv modules. (1) solaredge se7600h-ussnbbl 14 inverter. msp main derate - bus: 125 new main: 100. (n) dc system size: 6.16 kw-dc. (n) ac system size: 7.6 kw-ac. | $56,345 |
| Jun 1, 2023 | Completed final sign-off Jun 2023 | 130 Highland Av | Lifetime Roofing & Renovation Inc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $12,825 |
| May 31, 2023 | Never finaled issued May 2023, no final | 130 Highland Av | Cap Inc. Dba Journey Builders | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $4,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.