Block 5676, lot 034
313 Elsie St
- City’s use
- Multi-Family Residential
- Built
- 1963
- Stories
- 2
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 4,410 sq ft
- Lot
- 3,214 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 31, 2025 | Completed final sign-off May 2025 | 313 Elsie St | dryrot stucco repair, 50% at rear all in kind. not visible from street, plywood and 4 studs repair in-kindDetails
dryrot stucco repair, 50% at rear all in kind. not visible from street, plywood and 4 studs repair in-kind | $8,000 | |
| May 4, 2023 | Never finaled issued May 2023, no final | 313 Elsie St | Jesus Henriquez | to comply with nov 202303855: repair siding in kindDetails
to comply with nov 202303855: repair siding in kind | $2,000 |
| Jan 21, 2020 | Completed final sign-off Apr 2020 | 313 Elsie St | Control Fire Inc. | rev to pa# 201910235273 - as-built - changed copper to cpvc pipe wrapped in insulation.Details
rev to pa# 201910235273 - as-built - changed copper to cpvc pipe wrapped in insulation. | |
| Oct 23, 2019 | Completed final sign-off Mar 2020 | 313 Elsie St | Control Fire Inc. | fire sprinkler added in garage to be tied from e fire sprinkler system to protect new trash enclosure per building dep citation 201920801Details
fire sprinkler added in garage to be tied from e fire sprinkler system to protect new trash enclosure per building dep citation 201920801 | $2,224 |
| Apr 15, 2015 | Completed final sign-off Jul 2015 | 313 Elsie St | 3 F's Construction | open-up stucco, cut bottom plate by fire escape side of about 14' long & replace dry rot stud about 4' high. replace sheating, asphalt paper & stucco. provide alum metal flushing about 8" high from floor. second fl #313Details
open-up stucco, cut bottom plate by fire escape side of about 14' long & replace dry rot stud about 4' high. replace sheating, asphalt paper & stucco. provide alum metal flushing about 8" high from floor. second fl #313 | $1,200 |
| Dec 1, 2005 | Completed final sign-off Jan 2006 | 313 Elsie St | M L Nielsen Construction Inc | sheet rot replacement in kitchen, replace/repair in kind.Details
sheet rot replacement in kitchen, replace/repair in kind. | $4,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Control Fire Inc. (2), 3 F's Construction, Jesus Henriquez, M L Nielsen Construction Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.