Block 5358, lot 027
5128 03rd St
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 2
- Units
- 4
- Rooms
- 3 bathrooms
- Building
- 2,460 sq ft
- Lot
- 1,768 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2025 | Completed final sign-off Aug 2026 | 5128 03rd St | R & S Erection Of S F Inc | install manual roll up doors for security of windows on business. street facing, ground floor. no impact to public row, no electrical/full manuel, no inteior workDetails
install manual roll up doors for security of windows on business. street facing, ground floor. no impact to public row, no electrical/full manuel, no inteior work | $8,990 |
| Jan 10, 2012 | Never finaled issued Jan 2012, no final | 5126 03rd St | street spaceDetails
street space | ||
| Nov 4, 2011 | Completed final sign-off Jan 2012 | 5126 03rd St | Alive Design & Construction | repair wood siding at side of bldg due to fire damaged from adjacent structure. repair front door jamb. repair stair hand rail.Details
repair wood siding at side of bldg due to fire damaged from adjacent structure. repair front door jamb. repair stair hand rail. | $2,500 |
| Aug 9, 2007 | Expired or cancelled expired May 2008 | 5126 03rd St | Ames-Billingsley, Inc. | install 12 replacement windows. 6 visable from street, 6 front windows to be wood double hung, u-value .38-.52Details
install 12 replacement windows. 6 visable from street, 6 front windows to be wood double hung, u-value .38-.52 | $8,360 |
| Apr 19, 2007 | Completed final sign-off Jun 2007 | 5126 03rd St | Alive Design & Construction | upgrade extg restroom to be ada accessible(voluntary upgrade)Details
upgrade extg restroom to be ada accessible(voluntary upgrade) | $7,000 |
| Mar 12, 2007 | Never finaled issued Mar 2007, no final | 5128 03rd St | street spaceDetails
street space | ||
| Mar 9, 2007 | Completed final sign-off Apr 2007 | 5126 03rd St | voluntary seismic strengthening . perimeter foundation and mudsill, anchor bolts, hold downs, mudseal and additional concrete wallDetails
voluntary seismic strengthening . perimeter foundation and mudsill, anchor bolts, hold downs, mudseal and additional concrete wall | $6,000 | |
| Feb 14, 2007 | Completed final sign-off Jun 2007 | 5126 03rd St | Alive Design & Construction | replace damaged plaster with new drywall @ ground floor office & meeting area exterior walls. repair dry rot @ interior wall (north side bldg.) only.Details
replace damaged plaster with new drywall @ ground floor office & meeting area exterior walls. repair dry rot @ interior wall (north side bldg.) only. | $3,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Alive Design & Construction (3), Ames-Billingsley, Inc., R & S Erection Of S F Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.