Block 5054A, lot 109
2011 Bay Shore Blvd
- City’s use
- Miscellaneous/Mixed-Use
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 23, 2021 | Never finaled issued Dec 2021, no final | 2011 Bay Shore Bl | Quality Telecom Consultants | t-mobile wireless communication site on bldg. remove/replace (e) 100 amp meter panel & electric system. install 1 (n) 200 amp meter & 1 200 amp power protection cabinet(ppc). reconnect (e) loads from removed ac panel onto (n) ppc panelDetails
t-mobile wireless communication site on bldg. remove/replace (e) 100 amp meter panel & electric system. install 1 (n) 200 amp meter & 1 200 amp power protection cabinet(ppc). reconnect (e) loads from removed ac panel onto (n) ppc panel | $10,000 |
| Sep 17, 2020 | Completed final sign-off Oct 2021 | 2011 Bay Shore Bl | Mastec Network Solutions Inc | modify an existing unmanned telecom installation: install 3 air6449 antenna. remove 3 rrus. remove tma. install 3 rrus. install 6x12 (3) hybrid cable. install 19" rack, power 6230, bb6630 and bb6648.Details
modify an existing unmanned telecom installation: install 3 air6449 antenna. remove 3 rrus. remove tma. install 3 rrus. install 6x12 (3) hybrid cable. install 19" rack, power 6230, bb6630 and bb6648. | $25,000 |
| Oct 10, 2017 | Completed final sign-off Jan 2019 | 2011 Bay Shore Bl | Parsons Environment & Infrasteructure, Electric Tech Construction Inc | swap 3 existing antenna for 3 new antenna's, remove 3 existing radios & install 6 new radio models, remove existing dus41 inside existing cabinet, install 5216 inside cabinet & add dc/fiber jumpers. maher extention n/aDetails
swap 3 existing antenna for 3 new antenna's, remove 3 existing radios & install 6 new radio models, remove existing dus41 inside existing cabinet, install 5216 inside cabinet & add dc/fiber jumpers. maher extention n/a | $15,000 |
| Feb 24, 2016 | Completed final sign-off Mar 2017 | 2011 Bay Shore Bl | Metropolitan Electrical Construction | att - modification to att facility to include: r&r 3 antennas and add 3 rrus, other minor upgrades ti sm equip in equip rm maher naDetails
att - modification to att facility to include: r&r 3 antennas and add 3 rrus, other minor upgrades ti sm equip in equip rm maher na | $22,000 |
| Sep 3, 2015 | Never finaled filed Sep 2015, never issued | 2011 Bay Shore Bl | replace (3) 4'-0" (e) t-mobile antennas w/ (3) (n) 4'-0" antennas on (n) antenna mounts. install (3)(n) ericson rrus-all behind (e) parapet wall. reuse (e) fcs cables.Details
replace (3) 4'-0" (e) t-mobile antennas w/ (3) (n) 4'-0" antennas on (n) antenna mounts. install (3)(n) ericson rrus-all behind (e) parapet wall. reuse (e) fcs cables. | $20,000 | |
| Dec 13, 2013 | Completed final sign-off May 2014 | 2011 Bay Shore Bl | Triton Tower Inc | modification to an (e) at & t facility consisting of adding 3 new rrus near the antennas on roof.Details
modification to an (e) at & t facility consisting of adding 3 new rrus near the antennas on roof. | $6,000 |
| Jan 29, 2013 | Completed final sign-off Nov 2016 | 2011 Bay Shore Bl | Technical Solutions West Llc | remove & replace 6 (e) antennas, add 6 new rru's, add 3 new surge, 1 new gps, supressors, add 1 new splice box, & add 1 new 2 1/2" innerduct. also add 2 new rbs 6601 units in an (e) rack in equipment room on 1st floor.Details
remove & replace 6 (e) antennas, add 6 new rru's, add 3 new surge, 1 new gps, supressors, add 1 new splice box, & add 1 new 2 1/2" innerduct. also add 2 new rbs 6601 units in an (e) rack in equipment room on 1st floor. | $40,000 |
| Aug 27, 2012 | Completed final sign-off Oct 2012 | 2011 Bay Shore Bl | Universal Fire Equipment Co | install ul 300 fire suppression system to protect hood's and ducts and cooking equipment. ref app#201203276930Details
install ul 300 fire suppression system to protect hood's and ducts and cooking equipment. ref app#201203276930 | $4,000 |
| Mar 27, 2012 | Completed final sign-off Oct 2012 | 2011 Bay Shore Bl | Imbelloni Construction Co. Inc. | replace fire damage in storage room/office in kind. no structural work.Details
replace fire damage in storage room/office in kind. no structural work. | $40,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Electric Tech Construction Inc, Imbelloni Construction Co. Inc., Mastec Network Solutions Inc, Metropolitan Electrical Construction, Parsons Environment & Infrasteructure, Quality Telecom Consultants, Technical Solutions West Llc, Triton Tower Inc, Universal Fire Equipment Co
- Engineers
- John Anderson (2), Cliff Abernathy, Wissam Zalzali
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.