Block 4918, lot 025
895 Egbert Ave
- City’s use
- Miscellaneous/Mixed-Use
- Lot
- 59,999 sq ft
- Zoning
- M1
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 9, 2013 | Never finaled issued Sep 2013, no final | 895 Egbert Av | Sukut Construction Inc | revision to app#201005253174. finish grade control, modified agg base added to earl street. excavation callout change. addition of goitextile and geogrid rock fill thickness removed. elevation of fill media changes. attatched letter for additional infoDetails
revision to app#201005253174. finish grade control, modified agg base added to earl street. excavation callout change. addition of goitextile and geogrid rock fill thickness removed. elevation of fill media changes. attatched letter for additional info | |
| Jun 23, 2010 | Never finaled issued Jun 2010, no final | 895 Egbert Av | Envirocon Inc | 36 " excavation on vacant lot. (e) gates do not encroach over the property lineDetails
36 " excavation on vacant lot. (e) gates do not encroach over the property line | $48,000 |
| Jun 1, 2010 | Never finaled issued Jun 2010, no final | 895 Egbert Av | Envirocon Inc | to demolish commercial building awning structure.Details
to demolish commercial building awning structure. | $10,000 |
| May 25, 2010 | Never finaled issued Nov 2011, no final | 895 Egbert Av | Sukut Construction Inc, Envirocon Inc | remove concrete & asphalt pavement from entire site for off-site disposal. excavate soil to a planned depth of 1 to 10 ft below grade for off-site disposal. backfill & compact soil in 6 inch lifts to minimum 90% of relative density. grade will be restored to match surroundings.Details
remove concrete & asphalt pavement from entire site for off-site disposal. excavate soil to a planned depth of 1 to 10 ft below grade for off-site disposal. backfill & compact soil in 6 inch lifts to minimum 90% of relative density. grade will be restored to match surroundings. | $50,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Envirocon Inc (3), Sukut Construction Inc (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.