Block 4785, lot 001
1401 Griffith St
- City’s use
- Industrial
- Built
- 1946
- Stories
- 1
- Rooms
- 2 bathrooms
- Lot
- 119,999 sq ft
- Zoning
- M1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 9, 2022 | Never finaled filed Mar 2022, never issued | 1401 Griffith St | remove loft framing to comply with nov 202011941Details
remove loft framing to comply with nov 202011941 | ||
| Mar 5, 2020 | Never finaled filed Mar 2020, never issued | 1401 Griffith St | Ardo Construction Co. | to comply with nov 202011941 complete framing inuslate sheetrock 5/8 all surfaces and interior stairs to codeDetails
to comply with nov 202011941 complete framing inuslate sheetrock 5/8 all surfaces and interior stairs to code | |
| May 25, 2011 | Never finaled issued May 2011, no final | 1080 Shafter Av | replace 100 ft.of 4'x8' deteriorated exterior wood sheathing panels with new 4'x8' exterior fiber cement panels (hardiboard) at front of building. building paper and hardiboard. provide two layers of building paper at underside of hardiboard, nail hardiboard to stud with 10d@6" o.c.Details
replace 100 ft.of 4'x8' deteriorated exterior wood sheathing panels with new 4'x8' exterior fiber cement panels (hardiboard) at front of building. building paper and hardiboard. provide two layers of building paper at underside of hardiboard, nail hardiboard to stud with 10d@6" o.c. | $15,000 | |
| Feb 14, 2007 | Completed final sign-off Jun 2007 | 1401 Griffith St | Frank Fiala Roofing | reroofingDetails
reroofing | $84,544 |
| Aug 8, 2005 | Never finaled issued Oct 2005, no final | 1075 Revere Av | provide 2 new stairs from (e) ground floor to (e) 2nd floor. relocate tenant entry door.Details
provide 2 new stairs from (e) ground floor to (e) 2nd floor. relocate tenant entry door. | $20,000 | |
| Jun 3, 2004 | Completed final sign-off Apr 2005 | 1075 Revere Av | legalize and record warehouse spaces, partitions, toilets, mezzanines per nov 200338539 and area sepDetails
legalize and record warehouse spaces, partitions, toilets, mezzanines per nov 200338539 and area sep | $45,000 | |
| Jun 11, 2003 | Completed final sign-off Jun 2003 | 1076 Shafter Av | termite & dry rot repair, remove plywood finish only, cosmetic repair work only. 600 sq.ft. @ southDetails
termite & dry rot repair, remove plywood finish only, cosmetic repair work only. 600 sq.ft. @ south | $5,000 | |
| Apr 24, 2003 | Completed final sign-off Jun 2003 | 1060 Shafter Av | termite & dryrot repair removal of plywood finish only cosmetic repair work only at south wall.Details
termite & dryrot repair removal of plywood finish only cosmetic repair work only at south wall. | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ardo Construction Co., Frank Fiala Roofing
- Architects
- Gary Gee
- Engineers
- Benjamin Lai
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.