Permit GraphShortlistSan Francisco building permits since 2000

Block 4298, lot 001

601 25th St

City’s use
Industrial
Lot
79,997 sq ft
Zoning
M2
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

5 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 17, 2022Never finaled
filed Mar 2022, never issued
601 25th Stelectrical work to provide power for maintenance facility at 401 25th street (adjacent property). work includes patching walls/surfaces, and an underground electrical concrete duct bank. see pre-application reference documents for additional information.
Details
Permit
202203170200
Status
approved
Filed
Mar 17, 2022
Declared cost
$2,000,000
Address
601 25th St

electrical work to provide power for maintenance facility at 401 25th street (adjacent property). work includes patching walls/surfaces, and an underground electrical concrete duct bank. see pre-application reference documents for additional information.

Open the permit page

$2,000,000
Dec 30, 2019Completed
final sign-off Aug 2022
601 25th Streplace existing decommissioned boiler system with a new boiler system, remove existing and install new condensing units and cooling coil in the existing air handling unit, provide hose bibe in existing mechanical mezzanine, replace 1 existing vav with new and reroute duct work n/a maher
Details
Permit
201912300896
Status
complete
Filed
Dec 30, 2019
Permit issued
May 11, 2020
Final sign-off
Aug 9, 2022
Declared cost
$3,400,000
Address
601 25th St

replace existing decommissioned boiler system with a new boiler system, remove existing and install new condensing units and cooling coil in the existing air handling unit, provide hose bibe in existing mechanical mezzanine, replace 1 existing vav with new and reroute duct work n/a maher

Open the permit page

$3,400,000
Nov 2, 2016Never finaled
issued Jul 2017, no final
601 25th StCal State Constructors Incextension of platform (e) to accommodate fall protection requirement; maher n/a
Details
Permit
201611021773
Status
issued
Filed
Nov 2, 2016
Permit issued
Jul 21, 2017
Declared cost
$100,000
Address
601 25th St

extension of platform (e) to accommodate fall protection requirement; maher n/a

Open the permit page

$100,000
Nov 10, 2015Completed
final sign-off Mar 2016
601 25th StChampion Telecom Incinstall new dis server. install new 4 gang receptacle from dedicated 20 amp circuit in (e) panel. install new 4 gang receptacle at server from dedicated 30 amp circuit in (e) panel. install 6 new antennas. install radio cabinet. install cables; fiber optic, dc and coaxial. maher na
Details
Permit
201511102298
Status
complete
Filed
Nov 10, 2015
Permit issued
Jan 20, 2016
Final sign-off
Mar 31, 2016
Declared cost
$20,000
Address
601 25th St

install new dis server. install new 4 gang receptacle from dedicated 20 amp circuit in (e) panel. install new 4 gang receptacle at server from dedicated 30 amp circuit in (e) panel. install 6 new antennas. install radio cabinet. install cables; fiber optic, dc and coaxial. maher na

Open the permit page

$20,000
Feb 28, 2001Expired or cancelled
expired Jun 2001
601 25th Staddress assignment
Details
Permit
M15572
Status
expired
Filed
Feb 28, 2001
Permit issued
Feb 28, 2001
Address
601 25th St

address assignment

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Cal State Constructors Inc, Champion Telecom Inc
Engineers
Frank Leung, Kristine Low

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.