Block 4210, lot 022
1175 York St
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 2
- Units
- 2
- Rooms
- 6 bedrooms, 2 bathrooms
- Building
- 2,145 sq ft
- Lot
- 2,600 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 17, 2020 | Completed final sign-off Jan 2021 | 1175 York St | Jonathan Cole Construction | to comply with nov#201463601 item 204. new deck and exit stair from 2nd floor.Details
to comply with nov#201463601 item 204. new deck and exit stair from 2nd floor. | $10,000 |
| Feb 21, 2020 | Never finaled issued Feb 2020, no final | 1175 York St | street spaceDetails
street space | ||
| Feb 18, 2020 | Completed final sign-off Feb 2021 | 1175 York St | Mc Roofing | reroofingDetails
reroofing | $11,500 |
| Feb 13, 2020 | Completed final sign-off Jan 2021 | 1175 York St | Jonathan Cole Construction | comply with complaint # 201463601 # 6,7,8,9,10: downstair- kitchen and bathroom remodel. ikea kitchen no walls moving upstairs- kitchen remodel, remodel in kind. comply with cec 150.0(k) and 150.0(k)5.Details
comply with complaint # 201463601 # 6,7,8,9,10: downstair- kitchen and bathroom remodel. ikea kitchen no walls moving upstairs- kitchen remodel, remodel in kind. comply with cec 150.0(k) and 150.0(k)5. | $29,000 |
| Feb 13, 2020 | Completed final sign-off Aug 2020 | 1175 York St | Jonathan Cole Construction | inkind replacement of damaged wood siding on front elevationDetails
inkind replacement of damaged wood siding on front elevation | $5,500 |
| Feb 3, 2020 | Expired or cancelled cancelled Feb 2021 | 1175 York St | to comply with nov# 201463601 items 2 & 4; new railing and stair for existing deck @ rearDetails
to comply with nov# 201463601 items 2 & 4; new railing and stair for existing deck @ rear | $15,000 | |
| Jan 17, 2020 | Completed final sign-off Aug 2020 | 1175 York St | Jonathan Cole Construction | repair/siding on north side, not visible from street. redwood lap-siding. to comply with 201463601 item #3 for common area siding.Details
repair/siding on north side, not visible from street. redwood lap-siding. to comply with 201463601 item #3 for common area siding. | $14,000 |
| Nov 13, 2019 | Completed final sign-off Dec 2019 | 1175 York St | Dajani Construction | fixing items 2, 3, 7 on complaint #201463601. #2: repair step on stairs & handrail, #3: repair weather proofing on siding @ landing area, #7: provide cover plates to receptacles and switches/ not visible from streetDetails
fixing items 2, 3, 7 on complaint #201463601. #2: repair step on stairs & handrail, #3: repair weather proofing on siding @ landing area, #7: provide cover plates to receptacles and switches/ not visible from street | $250 |
| Sep 19, 2014 | Completed final sign-off Jul 2015 | 1175 York St | Dajani Construction | closing exposed metal studs wall and to comply with both notices item 2 + 4 on the violation #201463601Details
closing exposed metal studs wall and to comply with both notices item 2 + 4 on the violation #201463601 | $1,000 |
| May 9, 2003 | Completed final sign-off May 2003 | 1175 York St | to establish legality of two dwelling units on 2 flrs. (no basement) based on water dept record.Details
to establish legality of two dwelling units on 2 flrs. (no basement) based on water dept record. |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.