Block 4146, lot 019
2830 22nd St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 3
- Rooms
- 6 bedrooms, 5 bathrooms
- Building
- 4,575 sq ft
- Lot
- 2,596 sq ft
- Zoning
- RH3
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 30, 2024 | Completed final sign-off Jan 2025 | 2830 22nd St | Apollo Building & Roofing Group Inc. | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,000 |
| Oct 6, 2014 | Never finaled issued Oct 2014, no final | 2832 22nd St | add addresses to block 4146, lot 019 as; 2832 22nd st (front bldg), 2834 22nd st (rear bldg).Details
add addresses to block 4146, lot 019 as; 2832 22nd st (front bldg), 2834 22nd st (rear bldg). | ||
| Aug 6, 2014 | Completed final sign-off Jul 2015 | 2830 22nd St | provide fire sprinkler underground. ref. appl. 201407080672Details
provide fire sprinkler underground. ref. appl. 201407080672 | $2,500 | |
| Jul 22, 2014 | Completed final sign-off Sep 2015 | 2834 22nd St | for administration purpose, revise pa 201210011010s, correct scope of work; 3rd dwelling unit not added to (e) 2 unit, 3 story front bldg; instaead the unit is added to rear 2 story bldg. rear bldg occupancy conver storage to sfd. front bldg remains two unit. no change to oringal plan.Details
for administration purpose, revise pa 201210011010s, correct scope of work; 3rd dwelling unit not added to (e) 2 unit, 3 story front bldg; instaead the unit is added to rear 2 story bldg. rear bldg occupancy conver storage to sfd. front bldg remains two unit. no change to oringal plan. | ||
| Jul 8, 2014 | Completed final sign-off Jul 2015 | 2830 22nd St | J & C Safety 1st Fire Protection Inc | installation of fire system per nfpa 13d for rear cottage nad exit passage way on front building. underground separate permit- ref app#201210011010Details
installation of fire system per nfpa 13d for rear cottage nad exit passage way on front building. underground separate permit- ref app#201210011010 | $4,000 |
| May 30, 2013 | Never finaled issued May 2013, no final | 2830 22nd St | street space permitDetails
street space permit | ||
| Oct 9, 2012 | Never finaled issued Oct 2012, no final | 2830 22nd St | street spaceDetails
street space | ||
| Oct 1, 2012 | Expired or cancelled expired Jan 2024 | 2830 22nd St | add 3rd dwelling unit to (e) 2 unit bldg. remodel rear cottage to include kitchen, bathroom, half bath living rm, dining rm & bedroom. (reate new bridge to connect front bldg to rear cottage. (n) 3rd unit will be in rear cottage.Details
add 3rd dwelling unit to (e) 2 unit bldg. remodel rear cottage to include kitchen, bathroom, half bath living rm, dining rm & bedroom. (reate new bridge to connect front bldg to rear cottage. (n) 3rd unit will be in rear cottage. | $48,000 | |
| Aug 30, 2012 | Completed final sign-off Jun 2015 | 2830 22nd St | structural upgrade of extg rear cottage per plan. new beams, joists, new foundation, grade beams,slab, add plywood strengthening t walls.Details
structural upgrade of extg rear cottage per plan. new beams, joists, new foundation, grade beams,slab, add plywood strengthening t walls. | $75,000 | |
| Aug 6, 2012 | Completed final sign-off Nov 2013 | 2830 22nd St | remodel: new full bath @ ground floor unit 2, relocate (e) unit 1 kitchen. remodel 2nd floor (n) kitchen, baths and living areas. remodel (e) bath @ 3rd floor. new interior stairs. (n) fire rated corridors. structural upgrade per plans. relocate front entrance.Details
remodel: new full bath @ ground floor unit 2, relocate (e) unit 1 kitchen. remodel 2nd floor (n) kitchen, baths and living areas. remodel (e) bath @ 3rd floor. new interior stairs. (n) fire rated corridors. structural upgrade per plans. relocate front entrance. | $200,000 | |
| May 17, 2012 | Completed final sign-off Nov 2013 | 2830 22nd St | replacing 2 kitchens, replacing 4 bathrooms, install insulation @ liv/dining, demo & re-installing sheetrock; interior remodel, all work in kindDetails
replacing 2 kitchens, replacing 4 bathrooms, install insulation @ liv/dining, demo & re-installing sheetrock; interior remodel, all work in kind | $54,000 | |
| Feb 15, 2012 | Completed final sign-off Mar 2012 | 2830 22nd St | Tam Woot Remodeling | comply with complaint #199815800-remove cooking (kitchen) & bathroom facilities at cottage located at the rear of lotDetails
comply with complaint #199815800-remove cooking (kitchen) & bathroom facilities at cottage located at the rear of lot | $4,000 |
| Oct 16, 2000 | Completed final sign-off Nov 2000 | 2830 22nd St | Mr. Roofing, Inc. | reroofingDetails
reroofing | $8,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Apollo Building & Roofing Group Inc., J & C Safety 1st Fire Protection Inc, Mr. Roofing, Inc., Tam Woot Remodeling
- Engineers
- Rodrigo Santos (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.