Block 4096, lot 033
1924 22nd St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 10, 2012 | Completed final sign-off Jul 2012 | 1924 22nd St | rear bldg- modify stair at rear yard at grade to access patio for rear building only. work is for future lot split and deck at rear yard.Details
rear bldg- modify stair at rear yard at grade to access patio for rear building only. work is for future lot split and deck at rear yard. | $2,000 | |
| Dec 20, 2010 | Completed final sign-off Dec 2011 | 1924 22nd St | work on #1926 22nd street only - remodel kitchen & bathroom - remove cabinets in kitchen, lighting in kitchen & bathroom to be flourescent. no structural work. work on 1926 -22nd street only.Details
work on #1926 22nd street only - remodel kitchen & bathroom - remove cabinets in kitchen, lighting in kitchen & bathroom to be flourescent. no structural work. work on 1926 -22nd street only. | $20,000 | |
| Aug 31, 2010 | Completed final sign-off Sep 2010 | 997 De Haro St | to correct address on permit number pa# 201006094196 to show 997 deharo st.Details
to correct address on permit number pa# 201006094196 to show 997 deharo st. | ||
| Aug 31, 2010 | Completed final sign-off Oct 2010 | 1924 22nd St | to correct address on permit number 201006305696 to show 1924 22nd st.Details
to correct address on permit number 201006305696 to show 1924 22nd st. | ||
| Jul 16, 2010 | Completed final sign-off Sep 2010 | 995 De Haro St | lower front unit to remodel kitchen, 1 bathroom, full remodel 2nd bathroom replace fixtures. electrical, plumbing to be under separate permit. lighting in kitchen and bathroom to be fluorescent.Details
lower front unit to remodel kitchen, 1 bathroom, full remodel 2nd bathroom replace fixtures. electrical, plumbing to be under separate permit. lighting in kitchen and bathroom to be fluorescent. | $40,000 | |
| Jun 30, 2010 | Completed final sign-off Oct 2010 | 995 De Haro St | remodel kitchen:replace cabnet counters paint/ bathroom remodel:replace counter top tile floor and shower suround. electrical and plumbing under seperate permit. no structural work. new lighting comply with cec 150(k)Details
remodel kitchen:replace cabnet counters paint/ bathroom remodel:replace counter top tile floor and shower suround. electrical and plumbing under seperate permit. no structural work. new lighting comply with cec 150(k) | $12,000 | |
| Jun 22, 2010 | Never finaled issued Jun 2010, no final | 995 De Haro St | Frank Mccann | replace damage mudsill @ right side perimeter wall per report (inspection) #02222.Details
replace damage mudsill @ right side perimeter wall per report (inspection) #02222. | $3,500 |
| Jun 9, 2010 | Completed final sign-off Sep 2010 | 995 De Haro St | remove cabinets in existing breakfast nook-rewire breakfast nook, repair plumbing at laundry closet, repair dry rot at existing deck (rear) less than 20%Details
remove cabinets in existing breakfast nook-rewire breakfast nook, repair plumbing at laundry closet, repair dry rot at existing deck (rear) less than 20% | $4,000 | |
| Jun 4, 2001 | Completed final sign-off Jul 2001 | 995 De Haro St | Gil Construction & Assoc Inc. | repair work accord to workoff report 01656 (repair rear dec,k, dry-rot)Details
repair work accord to workoff report 01656 (repair rear dec,k, dry-rot) | $9,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Frank Mccann, Gil Construction & Assoc Inc.
- Architects
- Suheil Shatara
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.