Block 4093, lot 117
860 Kansas St #1
- City’s use
- Single Family Residential
- Built
- 1907
- Stories
- 2
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,015 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 2, 2021 | Completed final sign-off Jul 2021 | 860 Kansas St | Roofing Logistics | remove and replace 140 sq ft of siding integrated to room.replace in kind @ rear of building. cedar rusticDetails
remove and replace 140 sq ft of siding integrated to room.replace in kind @ rear of building. cedar rustic | $10,000 |
| Dec 17, 2019 | Completed final sign-off Jul 2020 | 860 Kansas St | Loza & Sons Inc | unit 1: remove 2 window at backside room and bathroom. install 2 new milgard tuscany low e sun coat max white. work not visible from street.Details
unit 1: remove 2 window at backside room and bathroom. install 2 new milgard tuscany low e sun coat max white. work not visible from street. | $2,400 |
| Oct 10, 2019 | Completed final sign-off Jul 2020 | 860 Kansas St | Loza & Sons Inc | replace (e) deckk & 3 decks, remove the roof, replace the decks. fix and replce damange siding board. approve 350sf. keep all good material; to replace less than 50% of (e) deck.Details
replace (e) deckk & 3 decks, remove the roof, replace the decks. fix and replce damange siding board. approve 350sf. keep all good material; to replace less than 50% of (e) deck. | $43,020 |
| Jul 8, 2019 | Completed final sign-off Jul 2020 | 860 Kansas St | Roofing Logistics | reroofDetails
reroof | $45,000 |
| May 21, 2014 | Completed final sign-off Sep 2014 | 860 Kansas St | Forum Renovation Co. Inc | #1- remove existing kitchen appliances, cabinet, sink, counter tops, replace with new. remove existing hardwood floors in kitchen, living room & replace with new, remove track lighting, replace with recessed led, new tile, paint.Details
#1- remove existing kitchen appliances, cabinet, sink, counter tops, replace with new. remove existing hardwood floors in kitchen, living room & replace with new, remove track lighting, replace with recessed led, new tile, paint. | $65,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.