Block 4083, lot 004
3001 19th St
- City’s use
- Industrial
- Built
- 1905
- Stories
- 2
- Rooms
- 2 bathrooms
- Lot
- 9,875 sq ft
- Zoning
- M1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 5, 2013 | Completed final sign-off Dec 2013 | 3001 19th St | Fnj Construction | demo and remove 4 non structural walls and 4 non structural partitons used as cubicles. patch 3 areas where wall became exposedDetails
demo and remove 4 non structural walls and 4 non structural partitons used as cubicles. patch 3 areas where wall became exposed | $4,500 |
| Sep 7, 2012 | Completed final sign-off Sep 2012 | 3001 19th St | Tyco Integrated Security | on 1st floor - add 4 strobes and 6 horn/strobesDetails
on 1st floor - add 4 strobes and 6 horn/strobes | $4,000 |
| Sep 5, 2012 | Completed final sign-off Sep 2012 | 3001 19th St | Golden Gate Fire Protection Inc | 1st floor fire sprinkler system upgrade, relocate 14 pendent sprinkler heads. ref t.i. #2012.0731.6150Details
1st floor fire sprinkler system upgrade, relocate 14 pendent sprinkler heads. ref t.i. #2012.0731.6150 | $7,210 |
| Jul 31, 2012 | Completed final sign-off Sep 2012 | 3001 19th St | Principal Builders Inc. | 1st floor:minor construction of partitions,addition of some new electrical outlets and lighting, small amount of added act, and cabinetry.Details
1st floor:minor construction of partitions,addition of some new electrical outlets and lighting, small amount of added act, and cabinetry. | $150,000 |
| Jul 20, 2012 | Completed final sign-off Sep 2012 | 3001 19th St | Principal Builders Inc. | demo of non-structural walls, floor finishes, millwork, mep fixtures & trim, will become vacant space per ab -017.Details
demo of non-structural walls, floor finishes, millwork, mep fixtures & trim, will become vacant space per ab -017. | $10,000 |
| Mar 2, 2012 | Never finaled issued Mar 2012, no final | 3001 19th St | to correct the record on permit #2009-0428-7249 and #2009-0310-3768. permit was never retail space; the correct use is office space.Details
to correct the record on permit #2009-0428-7249 and #2009-0310-3768. permit was never retail space; the correct use is office space. | ||
| Apr 28, 2009 | Never finaled issued Apr 2009, no final | 3001 19th St | renew pa# 2007/03/01/5203 to obtain final inspection. all work has been completed. change of use under pa# 2007/03/01/5203.Details
renew pa# 2007/03/01/5203 to obtain final inspection. all work has been completed. change of use under pa# 2007/03/01/5203. | ||
| Mar 10, 2009 | Completed final sign-off Apr 2009 | 3001 19th St | to obtain final inspection for work approved under pa#2007/01/24/2479. all work is complete.Details
to obtain final inspection for work approved under pa#2007/01/24/2479. all work is complete. | ||
| Jan 29, 2008 | Never finaled issued Jan 2008, no final | 3001 19th St | street space & sidewalkDetails
street space & sidewalk | ||
| Sep 12, 2007 | Never finaled issued Sep 2007, no final | 3001 19th St | Tyco Integrated Security | renewal app #200701242479 for final inspectionDetails
renewal app #200701242479 for final inspection | |
| Mar 1, 2007 | Never finaled issued Mar 2007, no final | 3001 19th St | J Dog Construction | 1st fl - build new walls to make 3 offices, build reception and coffee counter, level floor, build ramp. do all the needed electrical for offices and other spaces. do plumbing for the coffee counter, relocate 2 doors. change of use. hvac under seperate permit. no structural work.Details
1st fl - build new walls to make 3 offices, build reception and coffee counter, level floor, build ramp. do all the needed electrical for offices and other spaces. do plumbing for the coffee counter, relocate 2 doors. change of use. hvac under seperate permit. no structural work. | $32,000 |
| Jan 24, 2007 | Expired or cancelled expired Feb 2009 | 3001 19th St | Tyco Integrated Security | install new fire panel and fire protection devices. connect existing fire sprinkler system to new panel and monitor per nfpa 72. remote system monitoringDetails
install new fire panel and fire protection devices. connect existing fire sprinkler system to new panel and monitor per nfpa 72. remote system monitoring | $2,587 |
| Apr 19, 2000 | Expired or cancelled expired Apr 2001 | 3001 19th St | street spaceDetails
street space | ||
| Feb 14, 2000 | Expired or cancelled expired Jul 2001 | 3001 19th St | tenant improvements to grnd floor/accissible rstrmDetails
tenant improvements to grnd floor/accissible rstrm |
Find contractors for work like this