From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
46 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 679 03rd St | 3/f - interior remodel. reconfigure (e) interior spaces w/ one conferecne room, one storage, two ada restrooms, open office area, one kitchentte. remove & relocate non load bearing walls. remove (e) sink and unused shower. install sink water closet for new ada restrooms.Details
3/f - interior remodel. reconfigure (e) interior spaces w/ one conferecne room, one storage, two ada restrooms, open office area, one kitchentte. remove & relocate non load bearing walls. remove (e) sink and unused shower. install sink water closet for new ada restrooms. | $100,000 | |
| Nov 14, 2016 | Completed final sign-off Nov 2016 | 679 03rd St | Maven Maintenance Inc | repair to 5th flr cosmetic concrete repair of accent panel to correct nov 201638682. no cofa required as repair is ordinary maintenance and repair per section 1005. (3)Details
repair to 5th flr cosmetic concrete repair of accent panel to correct nov 201638682. no cofa required as repair is ordinary maintenance and repair per section 1005. (3) | $5,000 |
| Oct 27, 2016 | Never finaled issued Oct 2016, no final | 685 03rd St | street spaceDetails
street space | ||
| Sep 28, 2016 | Never finaled issued Sep 2016, no final | 679 03rd St | street space w/mtaDetails
street space w/mta | ||
| Oct 5, 2012 | Never finaled issued Oct 2012, no final | 685 03rd St | to show as build condition of entrance per sffd's request. reference ot pa #2005.06.08.4602.Details
to show as build condition of entrance per sffd's request. reference ot pa #2005.06.08.4602. | $5,000 | |
| Apr 19, 2011 | Never finaled filed Apr 2011, never issued | 685 03rd St | revision to 200506084602. revise occupant load calculationDetails
revision to 200506084602. revise occupant load calculation | ||
| Mar 11, 2011 | Never finaled issued Mar 2011, no final | 679 03rd St | J K M Fire Protection | 5th floor at new lowered ceiling - add 6 sprinklers from (e) fire system to (e) elevator lobby & exit stair, existing spk above lowered ceiling to remain.Details
5th floor at new lowered ceiling - add 6 sprinklers from (e) fire system to (e) elevator lobby & exit stair, existing spk above lowered ceiling to remain. | $2,000 |
| Feb 11, 2011 | Completed final sign-off Jan 2012 | 685 03rd St | Level 8 Construction Inc | to obtain final inspection for work approved under pa#200506084602 all work is complete.Details
to obtain final inspection for work approved under pa#200506084602 all work is complete. | |
| Jun 29, 2010 | Completed final sign-off Jan 2012 | 685 03rd St | San Francisco Fire Protection | add 8 horn/strobe and 7 strobes to existing fire alarm system . show elevatior recall on plans. bsmt, 1st & 2nd floors only.Details
add 8 horn/strobe and 7 strobes to existing fire alarm system . show elevatior recall on plans. bsmt, 1st & 2nd floors only. | $3,000 |
| Jun 10, 2010 | Completed final sign-off Jan 2012 | 685 03rd St | to obtain final inspection for work approved under pa#200806174608, all work is complete.Details
to obtain final inspection for work approved under pa#200806174608, all work is complete. | ||
| Jun 9, 2010 | Completed final sign-off Jan 2012 | 685 03rd St | Overnet Dba: Blue Pond Signs | spire restaurant. install internally led lit, stainless steel lettering.Details
spire restaurant. install internally led lit, stainless steel lettering. | $420 |
| Jun 9, 2010 | Completed final sign-off Jan 2012 | 685 03rd St | San Francisco Fire Protection | add 8 point modules to monitor new water flows, tamper switches, ansul system and duct detectorDetails
add 8 point modules to monitor new water flows, tamper switches, ansul system and duct detector | $3,000 |
| Jun 9, 2010 | Never finaled issued Jun 2010, no final | 685 03rd St | Overnet Dba: Blue Pond Signs | spire restaurant . sign "c" shown on plans. install steel cut-out letters on steel mounting bar. non illuminated, single face.Details
spire restaurant . sign "c" shown on plans. install steel cut-out letters on steel mounting bar. non illuminated, single face. | $2,300 |
| Jun 1, 2010 | Never finaled issued Jun 2010, no final | 685 03rd St | street space and mtaDetails
street space and mta | ||
| May 26, 2010 | Never finaled issued May 2010, no final | 685 03rd St | Nielson Mechanical Inc. | revision to pa# 208.08.19.9513. relocate kitchen equipment under hood and ansul nozzlesDetails
revision to pa# 208.08.19.9513. relocate kitchen equipment under hood and ansul nozzles | $1,000 |
| May 13, 2010 | Completed final sign-off Jan 2012 | 685 03rd St | obtain final inspection for work approved under pa# 2008-0819-9513. all work completeDetails
obtain final inspection for work approved under pa# 2008-0819-9513. all work complete | ||
| May 13, 2010 | Expired or cancelled expired Dec 2013 | 685 03rd St | Level 8 Construction Inc | ref. to 2005-0608-4602 bldg. arch. plans, make-up air & mechanical & hvac for restaurant.Details
ref. to 2005-0608-4602 bldg. arch. plans, make-up air & mechanical & hvac for restaurant. | $5,000 |
| Apr 30, 2010 | Never finaled issued Apr 2010, no final | 685 03rd St | street space and mta parkingDetails
street space and mta parking | ||
| Apr 13, 2010 | Completed final sign-off Jan 2012 | 685 03rd St | Level 8 Construction Inc | ground level exterior storefront at (e) restaurant (spire). ti for (e) restaurant approved underpa# 2009.09.19.7097 ( to complete work for work approved under pa# 2005.06.08.4602)Details
ground level exterior storefront at (e) restaurant (spire). ti for (e) restaurant approved underpa# 2009.09.19.7097 ( to complete work for work approved under pa# 2005.06.08.4602) | $40,000 |
| Apr 13, 2010 | Expired or cancelled expired Dec 2013 | 685 03rd St | Level 8 Construction Inc | revision to permit appl.#200807237377, (orig pa #200506084602). revised equipment layout at ground floor, second floor including walk-in refrigerator. no otherwork & no structural work.Details
revision to permit appl.#200807237377, (orig pa #200506084602). revised equipment layout at ground floor, second floor including walk-in refrigerator. no otherwork & no structural work. | |
| Feb 22, 2010 | Never finaled issued Feb 2010, no final | 685 03rd St | street spaceDetails
street space | ||
| Sep 17, 2009 | Expired or cancelled expired Dec 2013 | 685 03rd St | Level 8 Construction Inc | to complete work and obtain final inspection for work approved under pa#200506084602. for reference see pa#200806164539.Details
to complete work and obtain final inspection for work approved under pa#200506084602. for reference see pa#200806164539. | $50,000 |
| Dec 9, 2008 | Never finaled issued Dec 2008, no final | 685 03rd St | street space permit. renewal 1156901.Details
street space permit. renewal 1156901. | ||
| Sep 11, 2008 | Expired or cancelled cancelled Jan 2026 | 679 03rd St | sidewalk replacement per dpw per notification. the work includes structural re-inforced slabDetails
sidewalk replacement per dpw per notification. the work includes structural re-inforced slab | $20,000 | |
| Aug 19, 2008 | Completed final sign-off Jan 2012 | 685 03rd St | Nielson Mechanical Inc. | install hood and duct ansul fire suppression system. lite 1/2" conduit and 3/8" sch 40 black pipe workDetails
install hood and duct ansul fire suppression system. lite 1/2" conduit and 3/8" sch 40 black pipe work | $1,500 |
| Jul 23, 2008 | Expired or cancelled expired Dec 2013 | 685 03rd St | Level 8 Construction Inc | revise (e) pa# 2005-0608-4602, reduce number of water closets and lavatories in male & female restrooms. restroom from 3 to 2, relocate restaurant equipment in sake bar, sushi bar and kitchen area at ground floor.Details
revise (e) pa# 2005-0608-4602, reduce number of water closets and lavatories in male & female restrooms. restroom from 3 to 2, relocate restaurant equipment in sake bar, sushi bar and kitchen area at ground floor. | |
| Jun 17, 2008 | Completed final sign-off Jan 2012 | 685 03rd St | Aquamatic Fire Protection | relocate (e) sprinklers for new tenant improvements, construction project in 1st & 2nd floor, remove 3/4" pipe & replace with 1" pipe.Details
relocate (e) sprinklers for new tenant improvements, construction project in 1st & 2nd floor, remove 3/4" pipe & replace with 1" pipe. | $1,400 |
| Jun 16, 2008 | Expired or cancelled expired Dec 2013 | 685 03rd St | Level 8 Construction Inc | renew pa#200506084602 for continuation and completion of work.Details
renew pa#200506084602 for continuation and completion of work. | $300,000 |
| Jun 6, 2008 | Never finaled issued Jun 2008, no final | 679 03rd St | street space permitDetails
street space permit | ||
| May 31, 2006 | Completed final sign-off Oct 2006 | 685 03rd St | renew pa#200504281172 & #200504281174 for final inspection.Details
renew pa#200504281172 & #200504281174 for final inspection. | ||
| May 15, 2006 | Completed final sign-off Oct 2006 | 685 03rd St | renewal pa #200105310398Details
renewal pa #200105310398 | ||
| Aug 10, 2005 | Expired or cancelled expired May 2007 | 685 03rd St | Wisdom Electrical & Bldg Contractors | rmoval/repair existing sidwall/l install new eec. transformer & lover to sidewalk. install newDetails
rmoval/repair existing sidwall/l install new eec. transformer & lover to sidewalk. install new | $10,000 |
| Jul 21, 2005 | Expired or cancelled expired May 2007 | 685 03rd St | H 2 Fire Protection | add & relocate 14 sprinklers, basement 1stDetails
add & relocate 14 sprinklers, basement 1st | $3,000 |
| Jun 14, 2005 | Completed final sign-off Sep 2006 | 685 03rd St | rev.appl#200407279850 stair revision & (e)windows to remain at stairsDetails
rev.appl#200407279850 stair revision & (e)windows to remain at stairs | $3,000 | |
| Jun 8, 2005 | Completed final sign-off Jan 2012 | 685 03rd St | Ampeak Design & Const Co | storage at bsmt to remain.kitchen bar rest,dining to be at grd fl&2nd floor.med&title24 separateDetails
storage at bsmt to remain.kitchen bar rest,dining to be at grd fl&2nd floor.med&title24 separate | $600,000 |
| Apr 28, 2005 | Expired or cancelled expired May 2007 | 685 03rd St | Hiteco Construction Inc*** Check I. D*** | tenant improvements- interior walls, doors, new ada restrooms, exit signs at 3rd floor onlyDetails
tenant improvements- interior walls, doors, new ada restrooms, exit signs at 3rd floor only | $18,000 |
| Apr 28, 2005 | Expired or cancelled expired Oct 2006 | 685 03rd St | Hiteco Construction Inc*** Check I. D*** | teneant improvements: interior walls, new ada restrooms, exit signs, @ 4th floor onlyDetails
teneant improvements: interior walls, new ada restrooms, exit signs, @ 4th floor only | $6,500 |
| Apr 28, 2005 | Expired or cancelled expired Oct 2006 | 685 03rd St | Hiteco Construction Inc*** Check I. D*** | tenant improvements- interior walls, new ada restroom, exit signs at 5th floor onlyDetails
tenant improvements- interior walls, new ada restroom, exit signs at 5th floor only | $16,000 |
| Jul 27, 2004 | Completed final sign-off Sep 2006 | 685 03rd St | umb bldg additional new stair in the back of bldg as a second exitDetails
umb bldg additional new stair in the back of bldg as a second exit | $15,000 | |
| Apr 30, 2004 | Completed final sign-off Nov 2004 | 685 03rd St | Matrix Seismic Corp | renew app #200102121876/umb bldgDetails
renew app #200102121876/umb bldg | $3,000 |
| Apr 22, 2003 | Completed final sign-off May 2003 | 685 03rd St | Ampeak Design & Const Co | remove existing non conforming kitchens and bathroom at 2/f & 3/f for correction of code violation #Details
remove existing non conforming kitchens and bathroom at 2/f & 3/f for correction of code violation # | $2,000 |
| Apr 4, 2002 | Expired or cancelled cancelled Feb 2008 | 685 03rd St | install new store front pant of ada compliance umb bldg. revise 2001/02/12/1876 r-1.Details
install new store front pant of ada compliance umb bldg. revise 2001/02/12/1876 r-1. | $18,000 | |
| Dec 6, 2001 | Completed final sign-off Dec 2001 | 679 03rd St | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $21,000 |
| May 31, 2001 | Expired or cancelled expired Jan 2005 | 685 03rd St | interior remodel, new rest. at grd fl. kitchen in basement. modify stairs, entry to bDetails
interior remodel, new rest. at grd fl. kitchen in basement. modify stairs, entry to b | $150,000 | |
| Feb 12, 2001 | Completed final sign-off Nov 2004 | 685 03rd St | Matrix Seismic Corp | full compliance, general procedure "umb" bldg.Details
full compliance, general procedure "umb" bldg. | $90,000 |
| Apr 11, 2000 | Expired or cancelled expired Aug 2000 | 679 03rd St | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Level 8 Construction Inc (7), Hiteco Construction Inc*** Check I. D*** (3), Ampeak Design & Const Co (2), Matrix Seismic Corp (2), Nielson Mechanical Inc. (2), Overnet Dba: Blue Pond Signs (2), San Francisco Fire Protection (2), Aquamatic Fire Protection, H 2 Fire Protection, J K M Fire Protection, Maven Maintenance Inc, Tom Lee Roofing Inc., Wisdom Electrical & Bldg Contractors
- Architects
- Jeff Chow, Joyce Cheng, Kenneth Brogno
- Engineers
- Adel Yassin, Andrew Mercer
- Authorized agent-otherss
- Matrix Seismic (2)