Block 3774, lot 070
75 Federal St
- City’s use
- Commercial Office
- Built
- 1955
- Stories
- 2
- Rooms
- 4 bathrooms
- Building
- 9,898 sq ft
- Lot
- 10,000 sq ft
- Zoning
- M1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 26, 2019 | Completed final sign-off Jul 2020 | 75 Federal St | Ewsf Inc. | to install tower crane foundations. to erect and operate tower craneDetails
to install tower crane foundations. to erect and operate tower crane | $20,000 |
| Jun 3, 2019 | Completed final sign-off May 2020 | 75 Federal St | Granite Excavation & Demolition Inc | install temporary shoring and underpinning along property lines to retain existing improvement at 75 federal st and allow excavation for new development at 77 federal st.Details
install temporary shoring and underpinning along property lines to retain existing improvement at 75 federal st and allow excavation for new development at 77 federal st. | |
| Jan 28, 2019 | Completed final sign-off Jun 2019 | 75 Federal St | W C Plumbing & Fire Protection | reroute (e) fire sercice from discharge side of existing detector ck assembly to bldt. add new riser assembly at bldg and install new fdc on de boom st.Details
reroute (e) fire sercice from discharge side of existing detector ck assembly to bldt. add new riser assembly at bldg and install new fdc on de boom st. | $63,400 |
| Apr 11, 2012 | Expired or cancelled cancelled Mar 2013 | 75 Federal St | Thomas Swan Sign Co Inc | to erect electric, wall, single-faced, direct, new sign.Details
to erect electric, wall, single-faced, direct, new sign. | $7,000 |
| May 31, 2011 | Completed final sign-off Nov 2011 | 75 Federal St | insallation of wheel chair lift for voluntary accessabilty upgrade at open air parking lot of a commercial bldg. addtion of entry patio, metal stair, concrete walkway and stairway in fill plus or minus 116 sq ft. accessibility upgrade for extg restrooms on 1st floor and 2nd floor.Details
insallation of wheel chair lift for voluntary accessabilty upgrade at open air parking lot of a commercial bldg. addtion of entry patio, metal stair, concrete walkway and stairway in fill plus or minus 116 sq ft. accessibility upgrade for extg restrooms on 1st floor and 2nd floor. | $110,000 | |
| Apr 11, 2011 | Never finaled issued Apr 2011, no final | 75 Federal St | soft demo of an (e) building, space will remain vacant & no requirement for disabled access per sfbc ab-017. removal of non bearing walls & acoustic tile & t bar ceilingDetails
soft demo of an (e) building, space will remain vacant & no requirement for disabled access per sfbc ab-017. removal of non bearing walls & acoustic tile & t bar ceiling | $2,000 | |
| Oct 10, 2000 | Completed final sign-off Feb 2001 | 75 Federal St | Plant Construction | rev to pa 200004278372 (parking lot extension)- reduce size of parking area set back from plDetails
rev to pa 200004278372 (parking lot extension)- reduce size of parking area set back from pl | $1,000 |
| Apr 27, 2000 | Completed final sign-off Feb 2001 | 75 Federal St | Plant Construction | extend (e) parking area to property lineDetails
extend (e) parking area to property line | $75,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Plant Construction (2), Ewsf Inc., Granite Excavation & Demolition Inc, Thomas Swan Sign Co Inc, W C Plumbing & Fire Protection
- Engineers
- Erwin O'toole (2)