Block 3774, lot 002
540 Delancey St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 25, 2025 | Completed final sign-off May 2026 | 540 Delancey St | to obtain a final inspection for work approved under pa# 201902153082 & 201912038570 & 202109138330. fire alarm fire only permits to comply with sffd sec 1103.7.6.1.Details
to obtain a final inspection for work approved under pa# 201902153082 & 201912038570 & 202109138330. fire alarm fire only permits to comply with sffd sec 1103.7.6.1. | ||
| Sep 13, 2021 | Completed final sign-off May 2026 | 540 Delancey St | C & E Electric & Fire Alarm Services | to verify decibals on existing sounders throughout unitsDetails
to verify decibals on existing sounders throughout units | $1,000 |
| Dec 3, 2019 | Completed final sign-off May 2026 | 540 Delancey St | San Francisco Fire Protection | revision to pa 2019 0215 3082. like for like system replacement with upgrdae in partially sprinklered building. replace e facu with new ifp 75, e annunciator, smoke, heat det and 8 pull stations. install new aes monitor modulesDetails
revision to pa 2019 0215 3082. like for like system replacement with upgrdae in partially sprinklered building. replace e facu with new ifp 75, e annunciator, smoke, heat det and 8 pull stations. install new aes monitor modules | $30,000 |
| Feb 15, 2019 | Completed final sign-off May 2026 | 540 Delancey St | San Francisco Fire Protection | phase 1, like for like fire system replacement w/ (n) control panel, smoke & heat detectors, pull stations. (e) notification devices will be tid-in to (n) panel. install (n) radio commun, monitor modules for flow & tamper. will comply w/ (n) sffc for the rest of the bldg by 2021Details
phase 1, like for like fire system replacement w/ (n) control panel, smoke & heat detectors, pull stations. (e) notification devices will be tid-in to (n) panel. install (n) radio commun, monitor modules for flow & tamper. will comply w/ (n) sffc for the rest of the bldg by 2021 | $6,000 |
| Dec 14, 2006 | Expired or cancelled expired Nov 2008 | 540 Delancey St | Walschon Fire Protection Inc | unit #240: modify pipe to 14 fire sprinklers - change (e) pendent heads to concealed for new ceiling. total 14 heads 14 headsDetails
unit #240: modify pipe to 14 fire sprinklers - change (e) pendent heads to concealed for new ceiling. total 14 heads 14 heads | $2,700 |
| Dec 11, 2006 | Never finaled issued Dec 2006, no final | 540 Delancey St | street spaceDetails
street space | ||
| Dec 4, 2006 | Completed final sign-off Jun 2007 | 540 Delancey St | unit #204: install new wkitchen cabinets, change lighting, install plumbing for sink, paint whole interior, new free standing closet.Details
unit #204: install new wkitchen cabinets, change lighting, install plumbing for sink, paint whole interior, new free standing closet. | $22,000 | |
| Oct 5, 2006 | Never finaled issued Oct 2006, no final | 540 Delancey St | street space permit only.Details
street space permit only. | ||
| Jun 26, 2006 | Completed final sign-off Feb 2007 | 540 Delancey St | Draeger Construction Inc. | replace eixisting decking with life decking at common walkways and private decks and roof. apply flashing and door pans @ all units. grind all metal and stairs to bare metal and recoat. not facing street.Details
replace eixisting decking with life decking at common walkways and private decks and roof. apply flashing and door pans @ all units. grind all metal and stairs to bare metal and recoat. not facing street. | $280,000 |
| Nov 16, 2004 | Never finaled issued Nov 2004, no final | 540 Delancey St | street space permitDetails
street space permit | ||
| Oct 29, 2004 | Completed final sign-off Mar 2005 | 540 Delancey St | unti 402-rev 200409164375 scope of the revised work is to change the layout of mezzanine bathroom.Details
unti 402-rev 200409164375 scope of the revised work is to change the layout of mezzanine bathroom. | $2,500 | |
| Oct 8, 2003 | Never finaled issued Oct 2003, no final | 540 Delancey St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- San Francisco Fire Protection (2), C & E Electric & Fire Alarm Services, Draeger Construction Inc., Walschon Fire Protection Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.