Block 3755, lot 019
1118 Harrison St
- City’s use
- Industrial
- Built
- 1924
- Stories
- 1
- Units
- 1
- Rooms
- 3 bathrooms
- Lot
- 3,998 sq ft
- Zoning
- SLR
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 18, 2019 | Completed final sign-off Aug 2019 | 1118 Harrison St | S'top Roofing Company Inc | reroofingDetails
reroofing | $49,000 |
| Mar 8, 2019 | Completed final sign-off May 2019 | 1118 Harrison St | San Francisco Fire Protection | sprinkler monitoring - new facp, pull station, smk det, aes radio.Details
sprinkler monitoring - new facp, pull station, smk det, aes radio. | $2,000 |
| Sep 4, 2018 | Completed final sign-off May 2019 | 1118 Harrison St | Liberty Fire Systems Inc | add new fire sprinkler system through-out building per nfpa 13 with new 4-inch underground fire service off of 12-inch main on harrison st. ref 201805300443Details
add new fire sprinkler system through-out building per nfpa 13 with new 4-inch underground fire service off of 12-inch main on harrison st. ref 201805300443 | $32,000 |
| May 30, 2018 | Completed final sign-off Aug 2019 | 1118 Harrison St | Champion Construction Inc. | base building improvement of an (e) 1-story w/mezzanine bldg. scope to include removal of (e) stair, (n) stairs, (n) interior partitions for (n) office and accessible restrooms. mep & fire sprinkler permit deferred. maher naDetails
base building improvement of an (e) 1-story w/mezzanine bldg. scope to include removal of (e) stair, (n) stairs, (n) interior partitions for (n) office and accessible restrooms. mep & fire sprinkler permit deferred. maher na | $175,000 |
| Mar 30, 2018 | Expired or cancelled cancelled Jan 2026 | 1118 Harrison St | interior non-structural demolition of (e) first floor and mezzanine, interior non-structural partitions, plumbing fixtures, and finishes. maher naDetails
interior non-structural demolition of (e) first floor and mezzanine, interior non-structural partitions, plumbing fixtures, and finishes. maher na | $5,000 | |
| Apr 6, 2005 | Completed final sign-off Apr 2005 | 1118 Harrison St | Allied Heating & Air Conditioning | provide and install 3-ton dudless split heat pump.Details
provide and install 3-ton dudless split heat pump. | $10,000 |
| Nov 12, 2004 | Never finaled issued Nov 2004, no final | 1118 Harrison St | sidewalk & street space permitDetails
sidewalk & street space permit | ||
| Feb 22, 2000 | Completed final sign-off Jun 2000 | 1118 Harrison St | Occidental Express | revert back to lst legal use & remove all illegal work per nov & accissible entry doorDetails
revert back to lst legal use & remove all illegal work per nov & accissible entry door | $5,000 |
| Jan 31, 2000 | Expired or cancelled cancelled Jan 2000 | 1118 Harrison St | fill in existing opening with new concrete wall-same thicknsDetails
fill in existing opening with new concrete wall-same thickns | $950 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Allied Heating & Air Conditioning, Champion Construction Inc., Liberty Fire Systems Inc, Occidental Express, S'top Roofing Company Inc, San Francisco Fire Protection
- Architects
- Marc Dimalanta (2), Theodore G. Garcia
- Engineers
- Jefferson Chen
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.