Block 3746, lot 002
375 Beale St
- City’s use
- Commercial Office
- Lot
- 75,713 sq ft
- Zoning
- RC4
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 31, 2025 | In progress issued Feb 2025 | 375 Beale St | Urban Waterproofing Inc. | facade restoration and waterproofing and in-kind repairs. sealant at window perimeters. concrete crack and spall repairs in kind. (non structural)Details
facade restoration and waterproofing and in-kind repairs. sealant at window perimeters. concrete crack and spall repairs in kind. (non structural) | $120,000 |
| Aug 14, 2017 | Never finaled issued Sep 2017, no final | 375 Beale St | Zebra Awning Co Inc | sign painted on fabric. n/a maherDetails
sign painted on fabric. n/a maher | $600 |
| Aug 14, 2017 | Completed final sign-off Sep 2018 | 375 Beale St | Zebra Awning Co Inc | modify 6 existing awnings and recover with new fabric. 1 awning with sign. n/a maherDetails
modify 6 existing awnings and recover with new fabric. 1 awning with sign. n/a maher | $9,000 |
| Mar 4, 2016 | Never finaled issued Mar 2016, no final | 390 Main St | street space permitDetails
street space permit | ||
| Dec 23, 2015 | Never finaled issued Dec 2015, no final | 390 Main St | street spaceDetails
street space | ||
| Oct 23, 2015 | Never finaled issued Oct 2015, no final | 375 Beale St | street space and mta permitDetails
street space and mta permit | ||
| Sep 3, 2015 | Never finaled issued Sep 2015, no final | 390 Main St | street spaceDetails
street space | ||
| Aug 29, 2014 | Never finaled issued Aug 2014, no final | 390 Main St | street space permitDetails
street space permit | ||
| Aug 29, 2014 | Never finaled issued Sep 2014, no final | 390 Main St | Mc Carthy Building Companies Inc | new underground fire service tie in to existing water main on main st. +/- 1,000 gpm flow. all work in trench below grade in public row. n/a ordinance #155-13Details
new underground fire service tie in to existing water main on main st. +/- 1,000 gpm flow. all work in trench below grade in public row. n/a ordinance #155-13 | $40,000 |
| Apr 30, 2014 | Never finaled issued Apr 2014, no final | 390 Main St | street spaceDetails
street space | ||
| Dec 3, 2013 | Never finaled issued Dec 2013, no final | 390 Main St | street space permitDetails
street space permit | ||
| Sep 13, 2013 | Never finaled issued Sep 2013, no final | 390 Main St | street space permitDetails
street space permit | ||
| Aug 6, 2013 | Never finaled issued Aug 2013, no final | 390 Main St | street spaceDetails
street space | ||
| Aug 5, 2013 | Never finaled issued Aug 2013, no final | 390 Main St | street space permitDetails
street space permit | ||
| May 24, 2013 | Never finaled issued May 2013, no final | 375 Beale St | add address at new entrance at beale st as; 375 beale st. block 3746, lot 002.Details
add address at new entrance at beale st as; 375 beale st. block 3746, lot 002. | ||
| May 14, 2013 | Completed final sign-off Dec 2016 | 390 Main St | Drill Tech Drilling & Shoring Inc | temporary shoring and excavatins for 201 folsom street.Details
temporary shoring and excavatins for 201 folsom street. | $1,600,000 |
| Mar 28, 2013 | Never finaled issued Mar 2013, no final | 390 Main St | street spaceDetails
street space | ||
| Feb 28, 2013 | Never finaled issued Feb 2013, no final | 390 Main St | street space permitDetails
street space permit | ||
| Oct 12, 2012 | Expired or cancelled cancelled Jan 2026 | 390 Main St | Mc Carthy Building Companies Inc | soft demolition of non-structural walls & partitions, safe-off (e) elect & mech & plbg, selective remove non-load bearing loading docks, remove (e) equipment, isntall of temporary access barriers/corridors & ramp. (work will occur all floors).Details
soft demolition of non-structural walls & partitions, safe-off (e) elect & mech & plbg, selective remove non-load bearing loading docks, remove (e) equipment, isntall of temporary access barriers/corridors & ramp. (work will occur all floors). | $1,500,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Mc Carthy Building Companies Inc (2), Zebra Awning Co Inc (2), Drill Tech Drilling & Shoring Inc, Urban Waterproofing Inc.
- Engineers
- Brett Mariner
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.